HomeMy WebLinkAboutReso 64-22 Cloisters to continue assessmentRESOLUTION NO. 64-22
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF MORRO BAY, CALIFORNIA
DIRECTING THE LEVY OF THE ANNUAL ASSESSMENT
FOR THE CLOISTERS LANDSCAPING AND LIGHTING
MAINTENANCE ASSESSMENT DISTRICT PURSUANT TO THE
"LANDSCAPING AND LIGHTING ACT OF 1972"
(STREETS AND HIGHWAYS SECTIONS 22500 ET SEQ.)
THE CITY COUNCIL
City of Morro Bay, California
WHEREAS, on May 10, 2022, the City Council adopted Resolution No. 41-22 declaring
the Council's intent to levy an assessment for the annual maintenance of the Cloisters Park and
Open Space within the Cloisters Landscaping and Lighting Maintenance Assessment District (the
"District") and approving the Engineers Report; and
WHEREAS, a public hearing for the levy of the annual assessment of the District was
scheduled for June 28, 2022, at or about 5 30 p.m., in a hybrid format with both an in -person
meeting at the Morro Bay Veterans Memorial Building, 209 Surf Street, Morro Bay, CA 93442 as
well as through remote teleconferencing; or, consistent with the public health and safety, only
through remote teleconferencing pursuant to Assembly Bill 361 (2021-22) and Government Code
section 54953; and
WHEREAS, notices regarding the proposed assessment listing the date, time and location
of the public hearing were published in the local newspaper; and
WHEREAS, the City Council did take public testimony from all interested parties as to the
levy of the annual assessment for the District on June 28, 2022, in a hybrid format with both an
in -person meeting at the Morro Bay Veterans Memorial Building, 209 Surf Street, Morro Bay, CA
93442 as well as through remote teleconferencing; or, consistent with the public health and safety,
only through remote teleconferencing pursuant to Assembly Bill 361 (2021-22) and Government
Code section 54953.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Morro Bay:
1. The annual levy for the maintenance of the District, generally located as shown on
Exhibit "A" attached hereto, is hereby ordered and the assessment of $148,944 to be equally
distributed per assessable parcel for the Fiscal Year 2022/23 is hereby confirmed.
2 Adoption of this Resolution shall constitute the levy of an assessment for the Fiscal
Year 2022/23 and the City Clerk shall file the diagram and assessment with the County of San
Luis Obispo Auditor.
PASSED AND ADOPTED by the City Council of the City of Morro Bay at a regular meeting
thereof held this 28th day of June 2022 by the following roll call vote:
AYES. Headding, Addis, Barton, Ford, Heller
NOES: None
ABSENT: None
JOHN ADDING, MAYOR
TEST:
1r� Soy-'
D NA S1�
DA "NA SV1/ANSON, CITY CLERK
Exhibit "A"
CLOISTERS
LANDSCAPING AND LIGHTING
MAINTENANCE ASSESSMENT DISTRICT
DISTRICT BOUNDARY DIAGRAMS
The boundary diagrams for the District have previously been submitted to the City Clerk in the format required
under the 1972 Act and, by reference, are hereby made part of this Report. The boundary diagrams are available for
inspection at the office of the City Clerk during normal business hours. The following diagram provides an overview
of the District.
Cloisters Park and Open Space Landsca•ing and
Lighting Maintenance Assessment Dist c£Buundries
U _
0 ;J
r-
u
•
4
f:
st
•
•
a
rya •:.�
tMst y �
%irait:D1C11
f
FR. 19G
/tit t-!S
tar
4*
n.1Wit 4flOAforai
Corr fflo$U ONLY.
rcse?.)
I ri 2
t to
sroirr
•-• mow
" NO. /
Z
w >-
CC
cnU D
E
I) Ca 0
<0 CO
TRACT 1996 ; R.M. Ok. 17. P9.83.
ATASCADERO BEACH, R,M, Bk. 2 . Pg. 15
i
065-386
efl?
S
r
OF MORRO AY
�
aED
.