Loading...
HomeMy WebLinkAbout2021-11-02FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 11/2/2021  Daily Log Completed  The Daily Log was completed by Monica Weiss on Mon Dec 13, 2021 at 03:10pmPST.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL We are working on building the forms for the frog wall. We are starting the form work approx. 200 feet from the front gate so we will be able to extend the under ground pipe for the plant tie in (at a later date) We worked on the supports and handrail for the lift station. a 4" check valve was installed in the lift station. We fixed the frog fence on the east side of the job and fixed the front fence. 2 Daniel Ford No 17-OUTDOOR STORAGE AREA We are continuing to bring material to this area and get it ready to ship out. 3 Daniel Ford No SAFETY We continue to hold regular morning safety. We talked about confined spaces and emphasized the benefits of good stretching and proper housekeeping. 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins one slide gate was leaking a bit in the bnr so we will have to drain it and figure out whats happening with the gate and retest tomorrow 5 Daniel Ford No 95-OPERATIONS BUILDING Electra craft has installed all the lights and we laid out the tv supports for the control room. we will have to do a small modification to the mount for it to fit correctly 6 Daniel Ford No 96-MAINTENANCE BUILDING Kenects continues with the HVAC work we reminded them (again) to remove all the blue tape off the floor. they said they would take care of it, but that has not happened yet. they also continue work on the HVAC units. We are working on the floor repair for the concrete slab in this area.   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:18 AM PST          NOTES LOG    No.Created By Issue?Location Comments   Kenects has requested 2 more housekeeping pads and those are being formed up. 7 Daniel Ford No 50-RO/UV BUILDING We drilled more holes and epoxied in anchors for some of the pipe supports in this building Electracraft continues to install electrical equipment in the electrical room and Kenects is working on the plumbing for this area. 8 Daniel Ford No 60-PRODUCT WATER AREA>61-Product Water Area - Calcite Contactor We were installing pipe supports for the PVC pipes in this area today. 9 Daniel Ford No 20-HEADWORKS AREA We are installing the 16" elbow at the safe filter box. The 6" WWS line at the fine screens is being worked on as well. 10 Daniel Ford No 90-CHEMICAL FACILITY We are taking down the shade structure we built for the painters to do there fiberglassing. 11 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System We are doing misc patching and sacking in this area. 12 Daniel Ford No 12-SITE OVERALL - YARD PIPING We were installing chemical lines at the headworks and excavating the 3" was line near the dewatering SOG.   MANPOWER LOG 53 Workers  |   429.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 RARIG CONSTRUCTION, INC.4 7.5 30.0 70-RESIDUALS AREA>72-Residuals Area - Dewatering Facility     Notes:Steel Created By:  Daniel Ford    2 RARIG CONSTRUCTION, INC.4 7.5 30.0 17-OUTDOOR STORAGE AREA     Notes:Siding Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:18 AM PST        No.Contact/Company Workers # Hours Man Hours Location     3 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Daniel Ford   4 RARIG CONSTRUCTION, INC.6 8.0 48.0 17-OUTDOOR STORAGE AREA     Notes:Siding Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Carpenter Foreman Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Superintendent Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:Journeyman Laborers Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:Laborer Apprentice Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Journeyman operators Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:General Foreman Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:Journeyman Carpenters Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Laborer Foreman Created By:  Daniel Ford    13 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:Carpenters Apprentice Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:18 AM PST        No.Contact/Company Workers # Hours Man Hours Location     14 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:Journeyman Cement Mason Created By:  Daniel Ford    15 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:Apprentice Cement Mason Created By:  Daniel Ford    16 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:pipe fitter Created By:  Daniel Ford    17 ELECTRICRAFT, INC.9 8.0 72.0     Notes:Electrician Created By:  Rick Howland    18 Parada Painting Inc.2 10.0 20.0 90-CHEMICAL FACILITY     Notes:grinding Fiberglass Interior doors of the operations bldg Created By:  Monica Weiss       53  429.0    Manpower Log's Attachments:  17.  ELECTRICRAFT, INC.    11-2-2021 Daily Report.xls   18.  Parada Painting Inc.  2021.11.02 DFR.pdf   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:18 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 07:50AM   Albertsons 882001444380 Snacks    Comments:Created By: Matt King 2 07:50AM   Ryan Herco Flow Solutions 9788019 PVC Van Stone flange    Comments:Created By: Matt King   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:18 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   3 07:50AM   SMART & FINAL Snacks    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.11.02 Albertsons.pdf 2.  2021.11.02 Ryan Herco 24in VSF .pdf   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:18 AM PST        3.  2021.11.02 Smart Final.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 55°F 63°F 59°F 0.00 in.0.01 in.0.01 in.82%91%97%56°F 2.4 mph 5 mph 9 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   56°F Partly Cloudy   58°F Partly Cloudy   63°F Partly Cloudy   63°F Partly Cloudy   60°F Partly Cloudy   59°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:55:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:18 AM PST