HomeMy WebLinkAbout2021-11-03FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Wednesday 11/3/2021
Daily Log Completed
The Daily Log was completed by Monica Weiss on Mon Dec 13, 2021 at 03:14pmPST.
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL We are working on building one side of the forms for the frog
wall.
We worked on the supports and handrail for the lift station.
a 4" check valve was installed in the lift station.
2 Daniel Ford No SAFETY We continue to hold regular morning safety. We talked about
confined spaces and emphasized the benefits of good
stretching and proper housekeeping.
3 Daniel Ford No 30-TREATMENT AREA>31-
Treatment Area - BNR
Basins
We were working on the SHT mixers and grinding on the top
of wall.
We aso cut Stubs for the SHT BV
4 Daniel Ford No 95-OPERATIONS
BUILDING
Electra craft has installed all the lights and we laid out the tv
supports for the control room. we will have to do a small
modification to the mount for it to fit correctly
5 Daniel Ford No 96-MAINTENANCE
BUILDING
We formed 2 equipment pads.
And the Overhead door company came and put the correct
motors on the overhead doors.
6 Daniel Ford No 50-RO/UV BUILDING We drilled more holes and epoxied in anchors for some of the
pipe supports in this building
Electracraft continues to install electrical equipment in the
electrical room and Kenects is working on the plumbing for
this area.
7 Daniel Ford No 60-PRODUCT WATER
AREA>61-Product Water
Area - Calcite Contactor
We were installing pipe supports for the PVC pipes in this area
today.
8 Daniel Ford No 20-HEADWORKS AREA We are installing the 16" elbow at the safe filter box.
The 6" WWS line at the fine screens is being worked on as well.
FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 09:19 AM PST
NOTES LOG
No.Created By Issue?Location Comments
9 Daniel Ford No 90-CHEMICAL FACILITY We laid out the finish grade on the edge of the slab and area
and are sacking the exposed edge.
10 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
we are installing the RAS 14" flowmeters
11 Daniel Ford No 12-SITE OVERALL - YARD
PIPING
We finished working on the 3" WAS line near th dewatering.
The Chemical duct bank near the Calcite contactors was
finished
The 14" PRN line was exposed (4 hours)
We also exposed the 14" ROC line
12 Daniel Ford No 70-RESIDUALS AREA>73-
Residuals Area - SAFE Filter
System
We installed about 20 feet of pipe at the safe filter.
MANPOWER LOG 34 Workers | 283.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Carpenter Foreman
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Superintendent
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL
Notes:Journeyman Laborers
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL
Notes:Laborer Apprentice
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:Journeyman operators
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL
Notes:General Foreman
FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 09:19 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL
Notes:Journeyman Carpenters
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Laborer Foreman
Created By: Daniel Ford
9 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL
Notes:Carpenters Apprentice
Created By: Daniel Ford
10 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL
Notes:Journeyman Cement Mason
Created By: Daniel Ford
11 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL
Notes:Apprentice Cement Mason
Created By: Daniel Ford
12 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:pipe fitter
Created By: Daniel Ford
13 ELECTRICRAFT, INC.9 8.0 72.0
Notes:Created By: Rick Howland
14 Parada Painting Inc.2 11.0 22.0 95-OPERATIONS
BUILDING
Notes:Doors
Created By: Monica Weiss
34 283.0
Manpower Log's Attachments:
13. ELECTRICRAFT, INC.
11-3-2021 Daily Report.xls
FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 09:19 AM PST
14. Parada Painting Inc.
2021.11.03 DFR.pdf
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 0.0 No 06:05AM 00-GENERAL
Notes:18000 pound mini excavator
Created By: Daniel Ford
2 AHERN RENTAL 8.0 No 01:10PM 00-GENERAL
Notes:JCB
Created By: Daniel Ford
3 United Rental 8.0 No 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 No 05:40AM
Notes:Scissor lift
Created By: Daniel Ford
5 United Rental 8.0 No 03:05PM 00-GENERAL
Notes:24k generator
Created By: Daniel Ford
6 United Rental 8.0 No 05:40AM
Notes:loader
Created By: Daniel Ford
7 AHERN RENTAL 8.0 No 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
8 United Rental 8.0 No 02:00PM 00-GENERAL
Notes:Telescoping Forklift
FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 09:19 AM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 08:20AM Airgas 8115482261 Area 30 Welding
Comments:Created By: Matt King
2 08:20AM FERGUSON ENTERPRISES LLC 1468298 Testing Gaskets
Comments:Created By: Matt King
3 08:20AM PACIFIC COAST BOLT CORP 1091570 Anchorage A70
Comments:Created By: Matt King
Delivery Log's Attachments:
1.
2021.11.03 Airgas_A30 SS Welding.pdf
2.
2021.11.03 Ferguson Gaskets_MR115 Testing.pdf
FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 09:19 AM PST
3.
2021.11.03 Pacific Coast Bolt 1091570_A70.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
55°F 74°F 61°F 0.00 in.0.00 in.0.01 in.52%83%98%56°F 5.3 mph 10 mph 17 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
62°F
Clear
64°F
Clear
73°F
Clear
64°F
Clear
61°F
Clear
58°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 05:45:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 09:19 AM PST