Loading...
HomeMy WebLinkAbout2021-11-03FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 11/3/2021  Daily Log Completed  The Daily Log was completed by Monica Weiss on Mon Dec 13, 2021 at 03:14pmPST.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL We are working on building one side of the forms for the frog wall. We worked on the supports and handrail for the lift station. a 4" check valve was installed in the lift station. 2 Daniel Ford No SAFETY We continue to hold regular morning safety. We talked about confined spaces and emphasized the benefits of good stretching and proper housekeeping. 3 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins We were working on the SHT mixers and grinding on the top of wall. We aso cut Stubs for the SHT BV 4 Daniel Ford No 95-OPERATIONS BUILDING Electra craft has installed all the lights and we laid out the tv supports for the control room. we will have to do a small modification to the mount for it to fit correctly 5 Daniel Ford No 96-MAINTENANCE BUILDING We formed 2 equipment pads. And the Overhead door company came and put the correct motors on the overhead doors. 6 Daniel Ford No 50-RO/UV BUILDING We drilled more holes and epoxied in anchors for some of the pipe supports in this building Electracraft continues to install electrical equipment in the electrical room and Kenects is working on the plumbing for this area. 7 Daniel Ford No 60-PRODUCT WATER AREA>61-Product Water Area - Calcite Contactor We were installing pipe supports for the PVC pipes in this area today. 8 Daniel Ford No 20-HEADWORKS AREA We are installing the 16" elbow at the safe filter box. The 6" WWS line at the fine screens is being worked on as well.   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 09:19 AM PST          NOTES LOG    No.Created By Issue?Location Comments   9 Daniel Ford No 90-CHEMICAL FACILITY We laid out the finish grade on the edge of the slab and area and are sacking the exposed edge. 10 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System we are installing the RAS 14" flowmeters 11 Daniel Ford No 12-SITE OVERALL - YARD PIPING We finished working on the 3" WAS line near th dewatering. The Chemical duct bank near the Calcite contactors was finished The 14" PRN line was exposed (4 hours) We also exposed the 14" ROC line 12 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System We installed about 20 feet of pipe at the safe filter.   MANPOWER LOG 34 Workers  |   283.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Carpenter Foreman Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Superintendent Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:Journeyman Laborers Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:Laborer Apprentice Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Journeyman operators Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:General Foreman     FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 09:19 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  7 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:Journeyman Carpenters Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Laborer Foreman Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:Carpenters Apprentice Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:Journeyman Cement Mason Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:Apprentice Cement Mason Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:pipe fitter Created By:  Daniel Ford    13 ELECTRICRAFT, INC.9 8.0 72.0     Notes:Created By:  Rick Howland   14 Parada Painting Inc.2 11.0 22.0 95-OPERATIONS BUILDING     Notes:Doors Created By:  Monica Weiss       34  283.0    Manpower Log's Attachments:  13.  ELECTRICRAFT, INC.    11-3-2021 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 09:19 AM PST        14.  Parada Painting Inc.  2021.11.03 DFR.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 09:19 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 08:20AM   Airgas 8115482261 Area 30 Welding    Comments:Created By: Matt King 2 08:20AM   FERGUSON ENTERPRISES LLC 1468298 Testing Gaskets    Comments:Created By: Matt King 3 08:20AM   PACIFIC COAST BOLT CORP 1091570 Anchorage A70    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.11.03 Airgas_A30 SS Welding.pdf 2.  2021.11.03 Ferguson Gaskets_MR115 Testing.pdf   FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 09:19 AM PST        3.  2021.11.03 Pacific Coast Bolt 1091570_A70.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 55°F 74°F 61°F 0.00 in.0.00 in.0.01 in.52%83%98%56°F 5.3 mph 10 mph 17 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   62°F Clear   64°F Clear   73°F Clear   64°F Clear   61°F Clear   58°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:45:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 09:19 AM PST