Loading...
HomeMy WebLinkAbout2021-11-05FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 11/5/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL We are working on building one side of the forms for the frog wall. We worked on the supports and handrail for the lift station. a 4" check valve was installed in the lift station. 2 Daniel Ford No SAFETY We continue to hold regular morning safety. We talked about confined spaces and emphasized the benefits of good stretching and proper housekeeping. 3 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins We were working on the SHT mixers and grinding on the top of wall. We aso cut Stubs for the SHT BV We are welding the BNR air manifold. Also the 12" air manifold and the 30" riser at the cassette tak are being installed. 4 Daniel Ford No 95-OPERATIONS BUILDING Electra craft has installed all the lights and we laid out the tv supports for the control room. we will have to do a small modification to the mount for it to fit correctly 5 Daniel Ford No 96-MAINTENANCE BUILDING We formed 2 equipment pads. And the Overhead door company came and put the correct motors on the overhead doors. 6 Daniel Ford No 50-RO/UV BUILDING We drilled more holes and epoxied in anchors for some of the pipe supports in this building Electracraft continues to install electrical equipment in the electrical room and Kenects is working on the plumbing for this area. 7 Daniel Ford No 60-PRODUCT WATER AREA>61-Product Water Area - Calcite Contactor We were installing pipe supports for the PVC pipes in this area today. 8 Daniel Ford No 20-HEADWORKS AREA We are installing the 16" elbow at the safe filter box. The 6" WWS line at the fine screens is being worked on as well.   FBV Morro Bay Joint Venture Page 1 of 10 Printed on 1/24/2023 at 09:19 AM PST          NOTES LOG    No.Created By Issue?Location Comments   9 Daniel Ford No 90-CHEMICAL FACILITY We laid out the finish grade on the edge of the slab and area and are sacking the exposed edge. 10 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System The *" SS air piping is being installed for the casette tank 11 Daniel Ford No 12-SITE OVERALL - YARD PIPING We finished working on the 3" WAS line near th dewatering. The Chemical duct bank near the Calcite contactors was finished The 14" PRN line was exposed (4 hours) We also exposed the 14" ROC line 12 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System We installed about 20 feet of pipe at the safe filter.   MANPOWER LOG 34 Workers  |   278.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.10 8.0 80.0     Notes:Created By:  Rick Howland   2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Monica Weiss    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Monica Weiss    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Monica Weiss      FBV Morro Bay Joint Venture Page 2 of 10 Printed on 1/24/2023 at 09:19 AM PST        No.Contact/Company Workers # Hours Man Hours Location     5 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:LABORER FOREMAN Ricardo Belmontez Created By:  Monica Weiss    6 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Charlie Gonzalez Manny Hernandez Hector Sanchez Created By:  Monica Weiss    7 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Created By:  Monica Weiss    8 J.R. Filanc Construction Company, Inc.3 9.0 27.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Rick Jenne Coy Bright Created By:  Monica Weiss    9 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Micah Pixley Created By:  Monica Weiss    10 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CEMENT MASON Daniel Sechslingloff Harry Vanderhoofven Created By:  Monica Weiss    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Monica Weiss      FBV Morro Bay Joint Venture Page 3 of 10 Printed on 1/24/2023 at 09:19 AM PST        No.Contact/Company Workers # Hours Man Hours Location     12 J.R. Filanc Construction Company, Inc.2 8.0 16.0     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Monica Weiss    13 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez Created By:  Monica Weiss    14 Parada Painting Inc.2 8.0 16.0 95-OPERATIONS BUILDING     Notes:Finish Coat Interior doors Created By:  Monica Weiss       34  278.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    11-5-2021 Daily Report.xls   14.  Parada Painting Inc.  2021.11.05 DFR.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 10 Printed on 1/24/2023 at 09:19 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 11:40AM   AHERN RENTALS - SANTA MARIA 24219212 Soquel Stake Truck    Comments:Created By: Matt King 2 11:40AM   Capital Flow 11353 Gaskets MR73    Comments:Created By: Matt King 3 11:40AM   Capital Flow 32200169194 Return of 20x14 90 Bend DI    Comments:Created By: Matt King   FBV Morro Bay Joint Venture Page 5 of 10 Printed on 1/24/2023 at 09:19 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   4 11:40AM   Capital Flow 32200169194 Return of 20x14 90 Bend DI    Comments:Created By: Matt King 5 11:40AM   ECS Environmental Systems 5659 Missing Odor Control gaskets and backing ring    Comments:Created By: Matt King 6 11:40AM   FERGUSON ENTERPRISES LLC 9541325 Thread Tape Pipe seal    Comments:Created By: Matt King 7 11:40AM   Mid-Coast Fire Protection, Inc. 10901652 Fire Protection    Comments:Created By: Matt King 8 11:40AM   Shore-Tek Inc.6531 Shoring    Comments:Created By: Matt King 9 11:40AM   Shore-Tek Inc.6532 Test Plug    Comments:Created By: Matt King 10 11:40AM   HD Supply White Cap 44817171 Safety    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.11.05 Ahern Soquell Stake Truck.pdf   FBV Morro Bay Joint Venture Page 6 of 10 Printed on 1/24/2023 at 09:19 AM PST        2.  2021.11.05 Capflo MR73 Gaskets.pdf 3.  2021.11.05 Capflo Return of 20x14.pdf 4.  2021.11.05 Capflo Reurn to STAR 20x14 90.pdf   FBV Morro Bay Joint Venture Page 7 of 10 Printed on 1/24/2023 at 09:19 AM PST        5.  2021.11.05 ECS Odor Control Shims and Parts A20.pdf 6.  2021.11.05 Ferguson 9541325 Thread Tape Pipe Seal.pdf 7.  2021.11.05 Mid Coast Fire Protection.pdf   FBV Morro Bay Joint Venture Page 8 of 10 Printed on 1/24/2023 at 09:19 AM PST        8.  2021.11.05 Shoetek 490 Shoring 6531.pdf 9.  2021.11.05 Shoretek 490 Test Plug 6532.pdf 10.  2021.11.05 White Cap 44817171 Safety.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 58°F 73°F 62°F 0.00 in.0.00 in.0.00 in.44%70%84%52°F 8.4 mph 12 mph 18 mph   FBV Morro Bay Joint Venture Page 9 of 10 Printed on 1/24/2023 at 09:19 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   62°F Cloudy   61°F Cloudy   70°F Cloudy   61°F Cloudy   60°F Clear   58°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 10 of 10 Printed on 1/24/2023 at 09:19 AM PST