Loading...
HomeMy WebLinkAbout2021-11-09FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 11/9/2021  Daily Log Completed  The Daily Log was completed by Monica Weiss on Mon Dec 13, 2021 at 03:40pmPST.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL Electra craft was running the main electricity all over the site today. We worked on cleaning up area 17 and organizing the yard. We also stayed late and cleaned the street entrance from al the traffic and mud leaving the job RK&G removed their connex yesterday we are sacking and packing all exposed concrete edges of the concrete slabs 2 Daniel Ford No SAFETY We discussed crane safety and signals, muddy conditions, slips, trips, and falls as well as proper lifting 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System We worked on the 36 inch inch mixed liquor pipe on the east side of the MBR cassette tank today. 4 Daniel Ford No 95-OPERATIONS BUILDING Pristine was on site to fix any cracks and damage to the concrete floor. We modified and installed the TV mount 5 Daniel Ford No 96-MAINTENANCE BUILDING We cleaned this building. Kenects still has a lot of tape residue on the floors that will have to be det with before Pristine can do there work here. 6 Daniel Ford No 50-RO/UV BUILDING We worked on the the RO/UV anchors and started moving the pipe supports into the building. 7 Daniel Ford No 60-PRODUCT WATER AREA>61-Product Water Area - Calcite Contactor We were installing pipe supports for the PVC pipes in this area today. 8 Daniel Ford No 20-HEADWORKS AREA We are working on the FRP cover at the safe box   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:20 AM PST          NOTES LOG    No.Created By Issue?Location Comments   9 Daniel Ford No 90-CHEMICAL FACILITY We laid out the finish grade on the edge of the slab and area and are sacking the exposed edge. 10 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins We took measurements on the water level in the morning, there are no visible leaks in either slide gate and the RAZ pipe. equipment was moved to different locations in the tank and we were able to continue installing the 6" and 8" air stainless steel air line. as well as continue with the FRP baffles. 11 Daniel Ford No 12-SITE OVERALL - YARD PIPING The Chemical duct bank near the Calcite contactors was finished and backfilled   MANPOWER LOG 30 Workers  |   252.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Monica Weiss    2 J.R. Filanc Construction Company, Inc.1 10.0 10.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Monica Weiss    3 J.R. Filanc Construction Company, Inc.1 10.0 10.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Monica Weiss    4 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:LABORER FOREMAN Ricardo Belmontez Created By:  Monica Weiss    5 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo     FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:20 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Angel Diaz Charlie Gonzalez Manny Hernandez Hector Sanchez Created By:  Monica Weiss  6 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Created By:  Monica Weiss    7 J.R. Filanc Construction Company, Inc.3 9.0 27.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Rick Jenne Coy Bright Created By:  Monica Weiss    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Micah Pixley Created By:  Monica Weiss    9 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CEMENT MASON Daniel Sechslingloff Harry Vanderhoofven Created By:  Monica Weiss    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Monica Weiss    11 J.R. Filanc Construction Company, Inc.2 8.0 16.0     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Monica Weiss    12 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:20 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Monica Weiss  13 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland   14 Parada Painting Inc.2 9.0 18.0 96-MAINTENANCE BUILDING     Notes:Doors Created By:  Monica Weiss       30  252.0    Manpower Log's Attachments:  13.  ELECTRICRAFT, INC.    11-9-2021 Daily Report.xls   14.  Parada Painting Inc.  2021.11.09 DFR.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:20 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 08:50AM   Office Depot 676579 Paper    Comments:Created By: Matt King 2 12:35PM   Capital Flow 12157 4" PVC Bird screen    Comments:Created By: Matt King Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:20 AM PST        1.  2021.11.09 Office Depot.pdf 2.  2021.11.09 Capflo MR118 Frogwall.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 61°F 57°F 0.15 in.0.15 in.0.15 in.65%89%98%54°F 5.3 mph 10 mph 16 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Rain   53°F Rain   55°F Rain   60°F Cloudy   61°F Partly Cloudy   59°F Partly Cloudy   59°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No     FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:20 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:20 AM PST