HomeMy WebLinkAbout2021-11-10FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 11/10/2021  Daily Log Completed  The Daily Log was completed by Monica Weiss on Mon Dec 13, 2021 at 03:48pmPST.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL Electra craft was running the main electricity all over the site today. We worked on cleaning up area 17 and organizing the yard. We also stayed late and cleaned the street entrance from al the traffic and mud leaving the job We are sacking and packing all exposed concrete edges of the concrete slabs. We went through all the doors with RK&G today. The one door in the RO/UV is rubbing on the header (due to it sagging) RK&G asys the fix belongs to Rarig and not them. 2 Daniel Ford No SAFETY We discussed crane safety and signals, muddy conditions, slips, trips, and falls as well as proper lifting and working at heights. 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System We worked on the 36 inch inch mixed liquor pipe on the east side of the MBR cassette tank today. 4 Daniel Ford No 95-OPERATIONS BUILDING cleaning 5 Daniel Ford No 96-MAINTENANCE BUILDING We cleaned this building. Kenects still has a lot of tape residue on the floors that will have to be dealt with before Pristine can do there work here. 6 Daniel Ford No 50-RO/UV BUILDING We installed all t shaped pipe supports in the north side of the RO/UV building 7 Daniel Ford No 20-HEADWORKS AREA We are working on the FRP cover at the safe box   FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 09:21 AM PST          NOTES LOG    No.Created By Issue?Location Comments   8 Daniel Ford No 90-CHEMICAL FACILITY We laid out the finish grade on the edge of the slab and area and are sacking the exposed edge. 9 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins The eastern gate is still leaking so we will have to drain it and do the repair again equipment was moved to different locations in the tank and we were able to continue installing the 6" and 8" air stainless steel air line. as well as continue with the FRP baffles.   MANPOWER LOG 32 Workers  |   259.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.8 8.0 64.0     Notes:Electrician Created By:  Rick Howland    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 10.0 10.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:LABORER FOREMAN Ricardo Belmontez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 09:21 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Charlie Gonzalez Manny Hernandez Hector Sanchez Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.3 9.0 27.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Coy Bright Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Micah Pixley Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CEMENT MASON Daniel Sechslingloff Harry Vanderhoofven Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.2 8.0 16.0     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 09:21 AM PST        No.Contact/Company Workers # Hours Man Hours Location     13 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez Created By:  Daniel Ford    14 Parada Painting Inc.2 5.0 10.0 96-MAINTENANCE BUILDING     Notes:Touch up doors unmask Created By:  Monica Weiss       32  259.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    11-10-2021 Daily Report.xls   14.  Parada Painting Inc.  2021.11.10 DFR.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift   FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 09:21 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 12:40PM   FERGUSON ENTERPRISES LLC 9549188 30" Gaskets    Comments:Created By: Matt King 2 12:40PM   FERGUSON ENTERPRISES LLC 9596725 Gas pipe    Comments:Created By: Matt King 3 12:40PM   FERGUSON ENTERPRISES LLC Mega Flange A72    Comments:Created By: Matt King 4 12:40PM   Harrington Industrial Plastics LLC 004L3275-1 2" Coupling PVC Sch80    Comments:Created By: Matt King 5 12:40PM   JB DEWAR, INC 183629 Diesel    Comments:Created By: Matt King   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 09:21 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   6 12:40PM   NEGRANTI & SONS 32685 Sand    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.11.10 Ferguson 9549188 MR111 30in gaskets.pdf 2.  2021.11.10 Ferguson 9596725 Field A96 Gas Line.pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 09:21 AM PST        3.  2021.11.10 Ferguson MR111 A72 Mega flange.pdf 4.  2021.11.10 Harrington SHT A70 2in PVC Coupler.pdf 5.  2021.11.10 JB Dewar 183629.pdf   FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 09:21 AM PST        6.  2021.11.10 Negranti 32685 Sand Backfill Gas Line.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 54°F 69°F 61°F 0.00 in.0.15 in.0.15 in.49%74%98%52°F 5.2 mph 9 mph 16 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   58°F Clear   61°F Clear   67°F Clear   65°F Clear   66°F Clear   63°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:00:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 09:21 AM PST