Loading...
HomeMy WebLinkAbout2021-11-12FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 11/12/2021  Daily Log Completed  The Daily Log was completed by Monica Weiss on Mon Dec 13, 2021 at 03:56pmPST.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL Electra craft was running the main electricity all over the site today. JD Dewer was on site to fix the diesel tank We put the RO feed line under 50 lbs of pressure. It is holding and Steve Mimaga has verified the test. We drained a few feet of water, fixed the gate at the BNR tank, and refilled the tank. It is holding and Steve Mimaga has verified the test. There was a third party surveyor on site verifying where the easement is. Floor connection was on site to take care of the punch list items in the opps building as well as complete the instal in the maintenance building. We called off the rental wheelhouse forklift and jib this morning 2 Daniel Ford No SAFETY We discussed crane safety and signals, muddy conditions, slips, trips, and falls as well as proper lifting. We also talked about not being lack about safety due to it being friday we talked about keeping your head in the game 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System We did layout and installed temp pipe supports and some steel piping.   FBV Morro Bay Joint Venture Page 1 of 10 Printed on 1/24/2023 at 09:21 AM PST          NOTES LOG    No.Created By Issue?Location Comments   4 Daniel Ford No 95-OPERATIONS BUILDING We swept and cleaned all the floors. In the areas of the TV mount where we made adjustments we painted it and cleaned the entire mount. Floor connection was on site to install the missing base and to fix any problems in this building 5 Daniel Ford No 96-MAINTENANCE BUILDING Kenects is still installing bathroom fixtures in the unisex bathroom. Kenects still has a lot of tape residue on the floors that will have to be delt with before Pristine can do there work here. 6 Daniel Ford No 50-RO/UV BUILDING We worked on the the RO/UV anchors and started moving the pipe supports into the building. 7 Daniel Ford No 60-PRODUCT WATER AREA>61-Product Water Area - Calcite Contactor no work in this area today 8 Daniel Ford No 20-HEADWORKS AREA no work in this area today 9 Daniel Ford No 90-CHEMICAL FACILITY We laid out the finish grade on the edge of the slab and area and are sacking the exposed edge. 10 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins We lowered the water in the north tank to fix the leaky gate. The seal was adjusted, and we filled the tank back up. It appears to be holding with no visible leaks. We filled the evaporation pan and took a picture of the measurement and sent it to Steve Mimaga. We continued installing the 6" and 8" air stainless steel air line. as well as continue with the FRP baffles. 11 Daniel Ford No 12-SITE OVERALL - YARD PIPING We put the 18" RO feed line under pressure. It is holding true at 50 psi. We informed Steve Mimaga and sent him pictures of the test.   MANPOWER LOG 12 Workers  |   61.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.0 0.0 0.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 10 Printed on 1/24/2023 at 09:21 AM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.1 6.0 6.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.0 0.0 0.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.0 9.0 0.0 00-GENERAL     Notes:LABORER FOREMAN Ricardo Belmontez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.3 5.0 15.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Charlie Gonzalez Manny Hernandez Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 5.0 5.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.3 5.0 15.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Rick Jenne Coy Bright Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 5.0 10.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 3 of 10 Printed on 1/24/2023 at 09:21 AM PST        No.Contact/Company Workers # Hours Man Hours Location     9 J.R. Filanc Construction Company, Inc.0 0.0 0.0 00-GENERAL     Notes:CEMENT MASON Daniel Sechslingloff Harry Vanderhoofven Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 5.0 5.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 5.0 5.0     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.0 0.0 0.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez Created By:  Daniel Ford       12  61.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 10 Printed on 1/24/2023 at 09:21 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 12:50PM   AERZEN USA CORPORATION 009238 Expansion Joints for Blowers    Comments:Created By: Matt King 2 12:50PM   Capital Flow 1815263 Bolts at A71 Safe    Comments:Created By: Matt King 3 12:50PM   Capital Flow 1821099 BNG A30    Comments:Created By: Matt King 4 12:50PM   Cougartron INC 802 Steel Welding    Comments:Created By: Matt King 5 12:50PM   FERGUSON ENTERPRISES LLC 8064303 DMJ    Comments:Created By: Matt King 6 12:50PM   FERGUSON ENTERPRISES LLC 9433143 Catch Basin A95 Coupling    Comments:Created By: Matt King 7 12:50PM   FERGUSON ENTERPRISES LLC 9571798 Hydrants    Comments:Created By: Matt King 8 12:50PM   FERGUSON ENTERPRISES LLC 9588489 PVC Glue    Comments:Created By: Matt King   FBV Morro Bay Joint Venture Page 5 of 10 Printed on 1/24/2023 at 09:21 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   9 12:50PM   FERGUSON ENTERPRISES LLC 9595000 Link Seal at SHT    Comments:Created By: Matt King 10 12:50PM   Miner's Ace Hardware 722397 Primer for Monitor Stand    Comments:Created By: Matt King 11 12:50PM   HD Supply White Cap 44910576 Wall column form    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.11.12 Aerzen Blower Parts Expansion Joints.pdf 2.  2021.11.12 Capflo MR71 at SAFE.pdf   FBV Morro Bay Joint Venture Page 6 of 10 Printed on 1/24/2023 at 09:21 AM PST        3.  2021.11.12 Capflo MR96 A30 ML BNG.pdf 4.  2021.11.12 Cougartron Noxpower Welding Cleaning Pickling.pdf 5.  2021.11.12 Ferguson 24in DMJ.pdf   FBV Morro Bay Joint Venture Page 7 of 10 Printed on 1/24/2023 at 09:21 AM PST        6.  2021.11.12 Ferguson 9433143 Catch bason Drain A95 PVC Coupling.pdf 7.  2021.11.12 Ferguson 9571798 MR116 Hydrants.pdf 8.  2021.11.12 Ferguson 9588489 Field PVC Glue.pdf   FBV Morro Bay Joint Venture Page 8 of 10 Printed on 1/24/2023 at 09:21 AM PST        9.  2021.11.12 Ferguson 9595000 Link Seals at SHT.pdf 10.  2021.11.12 Miners 722397 Primer for Monitor Stand.pdf 11.  2021.11.12 White cap 44910576 Column form Lithion Grease.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 62°F 83°F 69°F 0.00 in.0.00 in.0.00 in.34%49%62%50°F 6.5 mph 9 mph 15 mph   FBV Morro Bay Joint Venture Page 9 of 10 Printed on 1/24/2023 at 09:21 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   65°F Clear   70°F Clear   79°F Clear   84°F Clear   63°F Clear   63°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:45:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 10 of 10 Printed on 1/24/2023 at 09:21 AM PST