HomeMy WebLinkAbout2021-11-15FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 11/15/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL Electra craft was running the main electricity all over the site today. We passed the pressure test for the RO feed line. Excavation for Electracraft at the MBR and for the light pole at the dewatering 2 Daniel Ford No SAFETY We discussed crane safety and signals, muddy conditions, slips, trips, and falls as well as proper lifting and working at heights. 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System Modify air piping at the cassette tank as well as installing supports on the top of the wall. 4 Daniel Ford No 95-OPERATIONS BUILDING cleaning 5 Daniel Ford No 96-MAINTENANCE BUILDING We cleaned this building. Kenects still has a lot of tape residue on the floors that will have to be dealt with before Pristine can do there work here. 6 Daniel Ford No 50-RO/UV BUILDING We installed all t shaped pipe supports in the north side of the RO/UV building 7 Daniel Ford No 20-HEADWORKS AREA We are working on the WWS line at the fine screens for the safe box. 8 Daniel Ford No 90-CHEMICAL FACILITY We laid out the finish grade on the edge of the slab and area and are sacking the exposed edge. 9 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins The eastern gate is still leaking so we will have to drain it and do the repair again equipment was moved to different locations in the tank and we were able to continue installing the 6" and 8" air stainless steel air line.   FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 09:22 AM PST          NOTES LOG    No.Created By Issue?Location Comments   as well as continue with the FRP baffles.   MANPOWER LOG 27 Workers  |   222.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.0 9.0 0.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.0 10.0 0.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:LABORER FOREMAN Ricardo Belmontez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Charlie Gonzalez Manny Hernandez Hector Sanchez Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 09:22 AM PST        No.Contact/Company Workers # Hours Man Hours Location     7 J.R. Filanc Construction Company, Inc.3 9.0 27.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Rick Jenne Coy Bright Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Micah Pixley Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CEMENT MASON Daniel Sechslingloff Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.2 8.0 16.0     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez Created By:  Daniel Ford    13 ELECTRICRAFT, INC.8 8.0 64.0     Notes:Created By:  Rick Howland      27  222.0    Manpower Log's Attachments:  13.  ELECTRICRAFT, INC.    11-15-2021 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 09:22 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 01:10PM   Capital Flow 0018058 6in 90MR73    Comments:Created By: Matt King 2 01:10PM   Capital Flow 1821099 Bolts    Comments:Created By: Matt King   FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 09:22 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   3 01:10PM   Capital Flow 1815263 Bolts    Comments:Created By: Matt King 4 01:10PM   Legrand 0002779370 Monitor Mount    Comments:Created By: Matt King 5 01:10PM   FedEx 93442 Monitor Brackets    Comments:Created By: Matt King 6 01:10PM   Ryan Herco Flow Solutions 9804716 PVC A50    Comments:Created By: Matt King 7 01:10PM   Trojan Technologies UV    Comments:Created By: Matt King 8 01:10PM   HD Supply White Cap 44821964 Safety    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.11.15 Capflo CBW 6in 90 MR73 .pdf   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 09:22 AM PST        2.  2021.11.15 Capflo Hodell MR96.pdf 3.  2021.11.15 CAPFLO Mr71 BN Hodell.pdf 4.  2021.11.15 Legrand Ext Monitor Mount.pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 09:22 AM PST        5.  2021.11.15 Monitor Brackets.pdf 6.  2021.11.15 Ryan Herco PVC RO-UV.pdf 7.  2021.11.15 Trojan UV 5 Pallets.pdf   FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 09:22 AM PST        8.  2021.11.15 White Cap 44821964 Safety.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 68°F 58°F 0.00 in.0.00 in.0.00 in.45%70%96%47°F 2.5 mph 5 mph 8 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   56°F Clear   62°F Partly Cloudy   65°F Partly Cloudy   56°F Partly Cloudy   55°F Partly Cloudy   53°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:35:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 09:22 AM PST