HomeMy WebLinkAbout2021-11-16FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 11/16/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL We dug for Electracraft at the MBR (ground wire and backfill), maintenance (groundwire),and a hour at the chem duct bank We also removed concrete from a ro line We moved some equipmane with the crane today and brought the crane to area 17 to do some scheduled maintenance on it 2 Daniel Ford No SAFETY We discussed crane safety and signals, muddy conditions, slips, trips, and falls as well as proper lifting and working at heights. 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System We are modifying and installing stainless steel air piping at the cassette tank as well as installing supports on the top of the wall. 4 Daniel Ford No 95-OPERATIONS BUILDING no work here today. 5 Daniel Ford No 96-MAINTENANCE BUILDING Kenects still has a lot of tape residue on the floors that will have to be dealt with before Pristine can do there work here. 6 Daniel Ford No 50-RO/UV BUILDING We laid out and build up the northern equipment pad for the ro feed line supports 7 Daniel Ford No 20-HEADWORKS AREA We are working on the WWS line at the fine screens for the safe box. We did a little grout pad for the small odor control pump (Recirc pump). We continued to set the 6" pipe at the safe filter box. 8 Daniel Ford No 90-CHEMICAL FACILITY We laid out the finish grade on the edge of the slab and area and are sacking the exposed edge. 9 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins We are pumping the water out of the northern BNR tank so we can install the remaining RAS pipe and plug and test the 12 inch WWS line.   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:26 AM PST          NOTES LOG    No.Created By Issue?Location Comments   10 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility We are installing the FLG adapters   MANPOWER LOG 28 Workers  |   231.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.0 10.0 0.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:LABORER FOREMAN Ricardo Belmontez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Charlie Gonzalez Manny Hernandez Hector Sanchez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:26 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.3 9.0 27.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Rick Jenne Coy Bright Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Micah Pixley Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CEMENT MASON Daniel Sechslingloff Harry Vanderhooven Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez Created By:  Daniel Ford    13 ELECTRICRAFT, INC.8 8.0 64.0     Notes:Created By:  Rick Howland     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:26 AM PST        No.Contact/Company Workers # Hours Man Hours Location        28  231.0    Manpower Log's Attachments:  13.  ELECTRICRAFT, INC.    11-16-2021 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:26 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 01:35PM   Airgas 1105469783 Shade    Comments:Created By: Matt King 2 01:35PM   Airgas 1105474157 Argon Compressed    Comments:Created By: Matt King 3 01:35PM   Harrington Industrial Plastics LLC 004L3402-1 Butterfly valves Odor control    Comments:Created By: Matt King 4 01:35PM   HD Supply White Cap 44783790 Frogwall Lumber    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.11.16 Airgas 1105469783 Shade.pdf 2.  2021.11.16 Airgas Argon 1105474157.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:26 AM PST        3.  2021.11.16 Harrington Odor Control BFV A20.pdf 4.  2021.11.16 White Cap 44783790 Frogwall Lumber.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 66°F 55°F 0.00 in.0.00 in.0.00 in.51%89%97%52°F 3.6 mph 6 mph 11 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   51°F Clear   58°F Clear   58°F Partly Cloudy   59°F Partly Cloudy   56°F Partly Cloudy   55°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:45:00 AM No     FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:26 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:26 AM PST