Loading...
HomeMy WebLinkAbout2021-11-18FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 11/18/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL We dug in the spare line for the PG&E line on Teresa st. Al lot of rock had to be chipped out to accomplish this. We installed all the straw waddles that arrived today. 2 Daniel Ford No SAFETY We discussed crane safety and signals, muddy conditions, slips, trips, and falls as well as proper lifting and working at heights. 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System We are modifying and installing stainless steel air piping at the cassette tank as well as installing supports on the top of the wall. 4 Daniel Ford No 95-OPERATIONS BUILDING signs were installed in this building today. 5 Daniel Ford No 96-MAINTENANCE BUILDING Kenects still has a lot of tape residue on the floors that will have to be dealt with before Pristine can do there work here. Signs were being installed as well. 6 Daniel Ford No 50-RO/UV BUILDING We laid out and build up the northern equipment pad for the ro feed line supports 7 Daniel Ford No 20-HEADWORKS AREA the 4" PRW line has been as built. All missing pieces for the safe filter box lid were located and the FRP beam that was mis cut has been reordered. 8 Daniel Ford No 90-CHEMICAL FACILITY 9 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins All water has been pumped out of the northern BNR basin, and all lifts have been charged 10 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility We are installing the FLG adapters. We dug the ditch for the electricians between the dewatering and the SHT.   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:27 AM PST          MANPOWER LOG 28 Workers  |   231.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.8 8.0 64.0     Notes:Electrician Created By:  Rick Howland    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Monica Weiss    3 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Monica Weiss    4 J.R. Filanc Construction Company, Inc.0 10.0 0.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Monica Weiss    5 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:LABORER FOREMAN Ricardo Belmontez Created By:  Monica Weiss    6 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Charlie Gonzalez Manny Hernandez Hector Sanchez Created By:  Monica Weiss    7 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Created By:  Monica Weiss      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:27 AM PST        No.Contact/Company Workers # Hours Man Hours Location     8 J.R. Filanc Construction Company, Inc.3 9.0 27.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Rick Jenne Coy Bright Created By:  Monica Weiss    9 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Micah Pixley Created By:  Monica Weiss    10 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CEMENT MASON Daniel Sechslingloff Harry Vanderhooven Created By:  Monica Weiss    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Monica Weiss    12 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Monica Weiss    13 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez Created By:  Monica Weiss       28  231.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    11-18-2021 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:27 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 01:45PM   ASAP 507109 Drawings    Comments:Created By: Matt King 2 01:45PM   Environmental Dynamics International (EDI) 81835 Bubble Diffusers    Comments:Created By: Matt King   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:27 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   3 01:45PM   FERGUSON ENTERPRISES LLC 5x6 Sleeve    Comments:Created By: Matt King 4 01:45PM   FERGUSON ENTERPRISES LLC SO0194043 Flanges SAFE    Comments:Created By: Matt King 5 01:45PM   HD Supply White Cap 44783790 Wrong size chamfer    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.11.18 ASAP Repro .pdf 2.  2021.11.18 EDI Aeration Bubble Diffusers.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:27 AM PST        3.  2021.11.18 Ferguson 5in 6in Sleeve GLV.pdf 4.  2021.11.18 Ferguson US Pipe MR107 SAFE.pdf 5.  2021.11.18 White Cap 44783790 RETURN Wrong Size Chamfer .pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 46°F 56°F 52°F 0.00 in.0.00 in.0.00 in.87%92%97%50°F 1.7 mph 4 mph 4 mph   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:27 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   47°F Cloudy   51°F Cloudy   55°F Cloudy   56°F Cloudy   55°F Cloudy   54°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:55:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:27 AM PST