HomeMy WebLinkAbout2021-11-19FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 11/19/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL We were cleaning up all the dirt pile around the job and working on sub grading for paving. We also clearing material and all construction trash all over the site. We were doing survey for the curbs starting up near the maintenance building. underground pipe testing is ongoing. Form work and material prep is ongoing for the frog wall. 2 Daniel Ford No SAFETY We discussed working around moving equipment and talked about the benefits of good housekeeping practices. 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System We are modifying and installing stainless steel air piping at the cassette tank as well as installing supports on the top of the wall. We were also working the blowers and piping the air feed pipes. We also installed the 6" drain line valve. 4 Daniel Ford No 95-OPERATIONS BUILDING signs were installed in this building today. Flooring connection was on site taking care of the rubber base 5 Daniel Ford No 96-MAINTENANCE BUILDING Kenects still has a lot of tape residue on the floors that will have to be dealt with before Pristine can do there work here. Flooring connection was in this building making sure all base was installed 6 Daniel Ford No 50-RO/UV BUILDING We stripped forms for equipment pads and pipe supports pad. We also backfilled all holes in this area. 7 Daniel Ford No 20-HEADWORKS AREA No work in this area today. 8 Daniel Ford No 90-CHEMICAL FACILITY We cleaned up the area outside the building and were working on the grades   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:27 AM PST          NOTES LOG    No.Created By Issue?Location Comments   9 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins All water has been pumped out of the northern BNR basin, and all lifts have been charged 10 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility We are installing the FLG adapters. 11 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank We did some rework for the mode Air and fabricated supports for the SHT.   MANPOWER LOG 28 Workers  |   232.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 10.0 10.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:LABORER FOREMAN Ricardo Belmontez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz     FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:27 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Manny Hernandez Hector Sanchez Created By:  Daniel Ford  6 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Brian Egin Rick Jenne Coy Bright Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Micah Pixley Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CEMENT MASON Daniel Sechslingloff Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 11.0 11.0     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:27 AM PST        No.Contact/Company Workers # Hours Man Hours Location     13 ELECTRICRAFT, INC.8 8.0 64.0     Notes:Created By:  Rick Howland      28  232.0    Manpower Log's Attachments:  13.  ELECTRICRAFT, INC.    11-19-2021 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:27 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 02:05PM   FERGUSON ENTERPRISES LLC 9600407 Chem A90 Plumbing    Comments:Created By: Matt King 2 02:05PM   Grainger 6530371011 Sewage pump    Comments:Created By: Matt King 3 02:05PM   Pacific Coast Bolt Corporation 1092141 Bolts    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.11.19 Ferguson Chem Area Plumbing MR120.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:27 AM PST        2.  2021.11.19 Grainger Sewage Pump.pdf 3.  2021.11.19 Pac Coast Bolt 1092141 MR127 ASBLT.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 49°F 59°F 55°F 0.00 in.0.00 in.0.00 in.77%87%96%51°F 5.2 mph 8 mph 12 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   51°F Partly Cloudy   54°F Partly Cloudy   58°F Partly Cloudy   59°F Partly Cloudy   55°F Partly Cloudy   56°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:45:00 AM No     FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:27 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:27 AM PST