HomeMy WebLinkAbout2021-11-24FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 11/24/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL We were cleaning up all the dirt pile around the job and working on sub grading for paving. We were doing survey for the curbs Form work and material prep is ongoing for the frog wall. 2 Daniel Ford No SAFETY We had a all hands meeting today and the main topic was our lock out tag out procedure. 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System We are modifying and installing stainless steel air piping at the cassette tank as well as installing supports on the top of the wall. We were also working the blowers and piping the air feed pipes (modifying the 8" S.S. pipe for the air blowers. We also installed the 6" and 8" drain line valve. 4 Daniel Ford No 95-OPERATIONS BUILDING No work in this area today 5 Daniel Ford No 96-MAINTENANCE BUILDING Kenects still has a lot of tape residue on the floors that will have to be dealt with before Pristine can do there work here. Flooring connection was in this building making sure all base was installed 6 Daniel Ford No 50-RO/UV BUILDING We stripped forms for equipment pads and pipe supports pad. We also backfilled all holes in this area. All piping and pipe supports have been moved beyond the boundaries of the asphalt 7 Daniel Ford No 20-HEADWORKS AREA No work in this area today.- 8 Daniel Ford No 90-CHEMICAL FACILITY We cleaned up the area outside the building and were working on the grades 9 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins All water has been pumped out of the northern BNR basin, and all lifts have been charged   FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 09:29 AM PST          NOTES LOG    No.Created By Issue?Location Comments   10 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility We are installing the FLG adapters. 11 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank We did some rework for the mode Air and fabricated supports for the SHT.   MANPOWER LOG 23 Workers  |   117.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 5.0 5.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 5.0 5.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 6.0 6.0 00-GENERAL     Notes:LABORER FOREMAN Ricardo Belmontez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.5 5.0 25.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Manny Hernandez Hector Sanchez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 09:29 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.2 5.0 10.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.3 5.0 15.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Brian Egin Rick Jenne Coy Bright Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.3 5.0 15.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Micah Pixley Raul Velasquez Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 5.0 5.0 00-GENERAL     Notes:CEMENT MASON Daniel Sechslingloff Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 5.0 5.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 5.0 5.0     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.1 5.0 5.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 09:29 AM PST        No.Contact/Company Workers # Hours Man Hours Location     13 Parada Painting Inc.2 4.0 8.0 50-RO/UV BUILDING     Notes:Touch up in various areas Created By:  Monica Weiss       23  117.0    Manpower Log's Attachments:  13.  Parada Painting Inc.  2021.11.24 DFR.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator   FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 09:29 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 63°F 58°F 0.00 in.0.00 in.0.00 in.30%48%68%38°F 5.5 mph 11 mph 17 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   54°F Clear   56°F Clear   62°F Clear   61°F Clear   59°F Clear   58°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 08:35:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 09:29 AM PST