Loading...
HomeMy WebLinkAbout2021-11-29FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 11/29/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL We are working on the Bollards for PG&E and finishing the grade the PG&E box off Teresa St. The 24" pipe at the declore area is being bolted up. 4" clamps are being installed at the lift station. Backfill around the pump station was happening today. We also continued work on the level spreaders (installing rocks) We had one laborer cleaning out the"footing" for the frog wall. 2 Daniel Ford No SAFETY We had a all hands meeting today and the main topic was our lock out tag out procedure. 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System We are bolting up the 6" SS ines at the cassette tank We were also working the blowers and piping the air feed pipes (modifying the 8" S.S. pipe for the air blowers. We also installed the 6" and 8" drain line valve. 4 Daniel Ford No 95-OPERATIONS BUILDING No work in this area today 5 Daniel Ford No 96-MAINTENANCE BUILDING Kenects still has a lot of tape residue on the floors that will have to be dealt with before Pristine can do there work here. Flooring connection was in this building making sure all base was installed 6 Daniel Ford No 50-RO/UV BUILDING We stripped forms for equipment pads and pipe supports pad. We also backfilled all holes in this area. All piping and pipe supports have been moved beyond the boundaries of the asphalt 7 Daniel Ford No 20-HEADWORKS AREA No work in this area today.- 8 Daniel Ford No 90-CHEMICAL FACILITY We cleaned up the area outside the building and were working on the grades   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:29 AM PST          NOTES LOG    No.Created By Issue?Location Comments   9 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins We are bolting up the FBR- air manifold piping (ss) 10 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility We are installing the FLG adapters. 11 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank We did some rework for the mode Air and fabricated supports for the SHT.   MANPOWER LOG 30 Workers  |   241.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.9 8.0 72.0     Notes:Created By:  Rick Howland   2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Monica Weiss    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Monica Weiss    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Monica Weiss    5 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:LABORER FOREMAN Ricardo Belmontez Created By:  Monica Weiss      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:29 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Manny Hernandez Hector Sanchez Created By:  Monica Weiss    7 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Benjamin Marquez III Created By:  Monica Weiss    8 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Brian Egin Rick Jenne Coy Bright Created By:  Monica Weiss    9 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Micah Pixley Raul Velasquez Created By:  Monica Weiss    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CEMENT MASON Daniel Sechslingloff Created By:  Monica Weiss    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Monica Weiss      FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:29 AM PST        No.Contact/Company Workers # Hours Man Hours Location     12 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Monica Weiss    13 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez Created By:  Monica Weiss       30  241.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    11-29-2021 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:29 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 08:05AM   CalPortland 1708882 Pipe Encasement    Comments:Created By: Matt King 2 08:05AM   Ferguson Enterprises, LLC 9615138 Sanitary Sewer Box    Comments:Created By: Matt King 3 08:05AM   Ferguson Enterprises, LLC 9623927 Frogwall    Comments:Created By: Matt King 4 08:05AM   HD Supply White Cap 45030677 Carpenter Material    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.11.29 Calportland pipe enc 1708882.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:29 AM PST        2.  2021.11.29 Ferguson 9615138 San Swr Box.pdf 3.  2021.11.29 Ferguson 9623927 Frogwall PRW.pdf 4.  2021.11.29 White Cap Carpenter 45030677.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 62°F 57°F 0.00 in.0.00 in.0.00 in.37%61%85%45°F 4.2 mph 9 mph 10 mph   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:29 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   57°F Clear   59°F Clear   63°F Clear   61°F Clear   58°F Clear   61°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:29 AM PST