HomeMy WebLinkAbout2021-11-30FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Tuesday 11/30/2021
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL We poured the frog wall today and the basses for the bollards
at Teressa St.
We installed hay around the entrance up in the entrance and
Waffles on the hill side
2 Daniel Ford No SAFETY We had a all hands meeting today and the main topic was our
lock out tag out procedure.
3 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
We are modifying and installing stainless steel air piping at the
cassette tank as well as installing supports on the top of the
wall.
We are tightening down the MJ on the 36" pipe
4 Daniel Ford No 95-OPERATIONS
BUILDING
No work in this area today
5 Daniel Ford No 96-MAINTENANCE
BUILDING
We are working on grading near this building.
Kenects still has a lot of tape residue on the floors that will
have to be dealt with before Pristine can do there work here.
6 Daniel Ford No 50-RO/UV BUILDING This area has been cleared for Granite to come do there job
7 Daniel Ford No 20-HEADWORKS AREA We installed the 4" flow meter
8 Daniel Ford No 90-CHEMICAL FACILITY We cleaned up the area outside the building and were
working on the grades
9 Daniel Ford No 30-TREATMENT AREA>31-
Treatment Area - BNR
Basins
All water has been pumped out of the northern BNR basin,
and all lifts have been charged
10 Daniel Ford No 70-RESIDUALS AREA>72-
Residuals Area -
Dewatering Facility
The 4" spools were being installed today
11 Daniel Ford No 70-RESIDUALS AREA>71-
Residuals Area - Sludge
Holding Tanks & SAFE
Settle Tank
We did some rework for the mode Air and fabricated supports
for the SHT.
FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:30 AM PST
MANPOWER LOG 32 Workers | 257.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 ELECTRICRAFT, INC.10 8.0 80.0
Notes:Created By: Rick Howland
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:SUPERINTENDENT
Troy Rosevear
Created By: Monica Weiss
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:GENERAL FOREMAN
Daniel Ford
Created By: Monica Weiss
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:CARPENTER FOREMAN
Phil Lacey
Created By: Monica Weiss
5 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL
Notes:LABORER FOREMAN
Ricardo Belmontez
Created By: Monica Weiss
6 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Martin Castillo
Angel Diaz
Manny Hernandez
Hector Sanchez
Created By: Monica Weiss
7 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL
Notes:LABORER APPRENTICE
Teddy Maldonado
Johnathan Torres
Benjamin Marquez III
Created By: Monica Weiss
FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:30 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
8 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Brian Egin
Rick Jenne
Coy Bright
Created By: Monica Weiss
9 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL
Notes:CARPENTER APPRENTICE
Pablo Campoverde
Micah Pixley
Raul Velasquez
Created By: Monica Weiss
10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:CEMENT MASON
Daniel Sechslingloff
Created By: Monica Weiss
11 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Certified Welder Pipefitter
Rick Dayton
Created By: Monica Weiss
12 J.R. Filanc Construction Company, Inc.2 8.0 16.0
Notes:APPRENTICE CEMENT MASON
Adolfo Campoverde
Samuel Rannals
Created By: Monica Weiss
13 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:OPERATOR APPRENTICE
Joe (Trevor) Hernandez
Created By: Monica Weiss
32 257.0
Manpower Log's Attachments:
1. ELECTRICRAFT, INC.
11-30-2021 Daily Report.xls
FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:30 AM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 0.0 No 06:05AM 00-GENERAL
Notes:18000 pound mini excavator
Created By: Daniel Ford
2 AHERN RENTAL 8.0 No 01:10PM 00-GENERAL
Notes:JCB
Created By: Daniel Ford
3 United Rental 8.0 No 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 No 05:40AM
Notes:Scissor lift
Created By: Daniel Ford
5 United Rental 8.0 No 03:05PM 00-GENERAL
Notes:24k generator
Created By: Daniel Ford
6 United Rental 8.0 No 05:40AM
Notes:loader
Created By: Daniel Ford
7 AHERN RENTAL 8.0 No 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
8 United Rental 8.0 No 02:00PM 00-GENERAL
Notes:Telescoping Forklift
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 08:10AM Aqua-Aerobic Systems, Inc.780-729541 SAFE Platform part blue
Comments:Created By: Matt King
2 08:10AM CalPortland 1708953 Frog Wall pour
Comments:Created By: Matt King
FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:30 AM PST
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
3 08:10AM Harrington Industrial Plastics
LLC
796154600 10in Filler Flange
Comments:Created By: Matt King
4 08:10AM Jifco, Inc.972-231794 Jifco SS Fittings
Comments:Created By: Matt King
5 08:10AM HD Supply White Cap 44801380 Wattle
Comments:Created By: Matt King
6 08:10AM HD Supply White Cap 44801380 Wattle
Comments:Created By: Matt King
Delivery Log's Attachments:
1.
2021.11.30 Aqua Aerobics Safe Platform Part Blue.pdf
2.
2021.11.30 Calportland 1708953 FrogWall.pdf
FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:30 AM PST
3.
2021.11.30 Harrington 10in Filler Flange Calcite.pdf
4.
2021.11.30 Jifco SS Fittings 5-3in.pdf
5.
2021.11.30 White Cap 44801380 Wattle.pdf
FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:30 AM PST
6.
2021.11.30 White cap Wattle 44801380.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
58°F 76°F 64°F 0.00 in.0.00 in.0.00 in.18%41%68%42°F 6.0 mph 11 mph 13 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
65°F
Clear
68°F
Clear
66°F
Clear
64°F
Clear
63°F
Clear
61°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 07:35:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:30 AM PST