HomeMy WebLinkAbout2021-12-01FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Wednesday 12/1/2021
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL We were working on moving materials and grading al over the
site today.
We are installing waffles and digging around electrical boxes
2 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
We are modifying and installing stainless steel air piping at the
cassette tank as well as installing supports on the top of the
wall.
We are tightening down the MJ on the 36" pipe
3 Daniel Ford No 96-MAINTENANCE
BUILDING
We are working on grading near this building.
Kenects still has a lot of tape residue on the floors that will
have to be dealt with before Pristine can do there work here.
4 Daniel Ford No 50-RO/UV BUILDING This area has been cleared for Granite to come do there job
5 Daniel Ford No 20-HEADWORKS AREA some backfilling was happening in this area.
We are installing anchors for the foul air and cabinet cover.
6 Daniel Ford No 30-TREATMENT AREA>31-
Treatment Area - BNR
Basins
All water has been pumped out of the northern BNR basin,
and all lifts have been charged
7 Daniel Ford No 70-RESIDUALS AREA>72-
Residuals Area -
Dewatering Facility
The 4" spools were being installed today
8 Daniel Ford No 70-RESIDUALS AREA>71-
Residuals Area - Sludge
Holding Tanks & SAFE
Settle Tank
we are installing 4" air lines at the top of the tank and workin
on 2" PVC supports.
9 Daniel Ford No 12-SITE OVERALL - YARD
PIPING
We exposed the leaking 4" PRW pipe for repair near the lower
head works area.
FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:30 AM PST
MANPOWER LOG 34 Workers | 264.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 ELECTRICRAFT, INC.10 8.0 80.0
Notes:Created By: Rick Howland
2 RARIG CONSTRUCTION, INC.2 3.0 6.0
Notes:Moving material
Created By: Michael Rarig
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:SUPERINTENDENT
Troy Rosevear
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:CARPENTER FOREMAN
Phil Lacey
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL
Notes:LABORER FOREMAN
Ricardo Belmontez
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Martin Castillo
Angel Diaz
Manny Hernandez
Charlie Gonzales
Jonathan Pratt
Estevan, Zamudio
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:LABORER APPRENTICE
Johnathan Torres
Benjamin Marquez III
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:30 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
8 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Brian Egin
Rick Jenne
Coy Bright
Donn, Bunte
Orlando Cortez
Created By: Daniel Ford
9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:CARPENTER APPRENTICE
Raul Velasquez
Created By: Daniel Ford
10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:CEMENT MASON
Daniel Sechslingloff
Created By: Daniel Ford
11 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL
Notes:Certified Welder Pipefitter
Rick Dayton
Created By: Daniel Ford
12 J.R. Filanc Construction Company, Inc.2 8.0 16.0
Notes:APPRENTICE CEMENT MASON
Adolfo Campoverde
Samuel Rannals
Created By: Daniel Ford
13 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:OPERATOR APPRENTICE
Joe (Trevor) Hernandez
Created By: Daniel Ford
34 264.0
Manpower Log's Attachments:
1. ELECTRICRAFT, INC.
12-1-2021 Daily Report.xls
FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:30 AM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 0.0 No 06:05AM 00-GENERAL
Notes:18000 pound mini excavator
Created By: Daniel Ford
2 AHERN RENTAL 8.0 No 01:10PM 00-GENERAL
Notes:JCB
Created By: Daniel Ford
3 United Rental 8.0 No 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 No 05:40AM
Notes:Scissor lift
Created By: Daniel Ford
5 United Rental 8.0 No 03:05PM 00-GENERAL
Notes:24k generator
Created By: Daniel Ford
6 United Rental 8.0 No 05:40AM
Notes:loader
Created By: Daniel Ford
7 AHERN RENTAL 8.0 No 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
8 United Rental 8.0 No 02:00PM 00-GENERAL
Notes:Telescoping Forklift
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 08:20AM All State Supply 155185 Bollards
Comments:Created By: Matt King
2 08:20AM Central Coast Auto 38298 Smog Check Crew Truck
Comments:Created By: Matt King
FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:30 AM PST
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
3 08:20AM Ferguson Enterprises, LLC 9615138-1 Valves Sanitary Sewer
Comments:Created By: Matt King
4 08:20AM PRW Steel 394641 Shims for FRP Tank Anchorage
Comments:Created By: Matt King
5 08:20AM HD Supply White Cap 45118360 Wattle
Comments:Created By: Matt King
Delivery Log's Attachments:
1.
2021.12.01 Allstate Utility Supply Bollards.pdf
2.
2021.12.01 Central Coast Auto Smog.pdf
FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:30 AM PST
3.
2021.12.01 Ferguson Valves San Sewer 9615138-1.pdf
4.
2021.12.01 PRW Supply 394641 SS Plates.pdf
5.
2021.12.01 White cap Wattle 45118360.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
50°F 70°F 62°F 0.00 in.0.00 in.0.00 in.31%50%89%41°F 4.4 mph 10 mph 16 mph
FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:30 AM PST
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
62°F
Clear
67°F
Clear
71°F
Clear
67°F
Clear
56°F
Clear
51°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 07:10:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:30 AM PST