HomeMy WebLinkAbout2021-12-03FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 12/3/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL Jobsite clean up was on going today as well as organizing sea train storage areas. We were also installing wattles. We were cutting grade for Granite, and working on the soil slip swales. The bull dozer was cleaned today. We the frog wall was being stripped and we paced concrete in the bollards at the PG&E vault. We continue with the pipe testing. 2 Daniel Ford No 20-HEADWORKS AREA We are doing some work on the odor control equipment 3 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins no work in this area today 4 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility The 4" spools were being installed today 5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank The masons continue sacking, patching, and bushinging the top of the SHT walls. We are continuing with the supports for the 2" PVC lines. 6 Daniel Ford No 12-SITE OVERALL - YARD PIPING We exposed the leaking 4" PRW pipe for repair near the lower head works area. 7 Daniel Ford No 60-PRODUCT WATER AREA>61-Product Water Area - Calcite Contactor We are working on the pvc pipe supports. We are fabricating and installing. We are installing the spools and expansion joints at the water tank for the calcite area   FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 09:31 AM PST          MANPOWER LOG 20 Workers  |   162.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:LABORER FOREMAN Ricardo Belmontez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Manny Hernandez Charlie Gonzales Jonathan Pratt Estevan, Zamudio Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:LABORER APPRENTICE Benjamin Marquez III Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Brian Egin Rick Jenne Coy Bright Donn Bunte Orlando Cortez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 09:31 AM PST        No.Contact/Company Workers # Hours Man Hours Location     7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE Raul Velasquez Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CEMENT MASON Daniel Sechslingloff Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.2 8.0 16.0     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez Created By:  Daniel Ford       20  162.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB   FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 09:31 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 09:05AM   CalPortland 1711059 Pipe Encasements    Comments:Created By: Matt King 2 09:05AM   Capital Flow 12157 Bird Screen    Comments:Created By: Matt King 3 09:05AM   ITP 1274692 MR100    Comments:Created By: Matt King 4 09:05AM   Fastenal CALUI108587 Trod    Comments:Created By: Matt King   FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 09:31 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   5 09:05AM   NEGRANTI & SONS 33755 Crushed Sand    Comments:Created By: Matt King 6 09:05AM   UNITED RENTALS (NORTH AMERICA) INC 178663 Rammer    Comments:Created By: Matt King 7 09:05AM   HD Supply White Cap 45151937 Concrete glue    Comments:Created By: Matt King 8 09:05AM   HD Supply White Cap 45168254 Paint    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.12.03 Calportland Pipe Enc 1711059.pdf 2.  2021.12.03 Capflo Bird Screen 12157.pdf   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 09:31 AM PST        3.  2021.12.03 Capflo ITP MR100.pdf 4.  2021.12.03 Fastenal TROD 8587.pdf 5.  2021.12.03 Negranti 33755_160194.pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 09:31 AM PST        6.  2021.12.03 United Rammer 4123.pdf 7.  2021.12.03 White cap sonatube glue.pdf 8.  2021.12.03 White Cap Survey 45168254.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 48°F 55°F 52°F 0.00 in.0.00 in.0.00 in.85%92%98%50°F 2.3 mph 3 mph 4 mph   FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 09:31 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   49°F Cloudy   49°F Cloudy   55°F Cloudy   56°F Cloudy   55°F Cloudy   55°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:00:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 09:31 AM PST