Loading...
HomeMy WebLinkAbout2021-12-04FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Saturday 12/4/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank We worked on fabing and installing the 4" SS piping for the blowers and the 2" PVC on top of the tank. 2 Daniel Ford No 60-PRODUCT WATER AREA We fabricated the 8" and 10" spolls for the water tank and the calcite lines install and ex joints 3 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System We are installing the 8" spacers at the safe filter   MANPOWER LOG 4 Workers  |   32.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:Rick Dayton - Pipe Fitter Martin Castillo - Laborer Orlando Cortez - Carpenter Coy Brite - Carpenter Created By:  Daniel Ford       4  32.0    Manpower Log's Attachments:    WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 46°F 56°F 51°F 0.00 in.0.00 in.0.00 in.74%83%89%47°F 5.6 mph 9 mph 13 mph   FBV Morro Bay Joint Venture Page 1 of 2 Printed on 1/24/2023 at 09:32 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   47°F Partly Cloudy   50°F Clear   55°F Clear   56°F Clear   53°F Clear   52°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 08:40:00 PM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 2 of 2 Printed on 1/24/2023 at 09:32 AM PST