HomeMy WebLinkAbout2021-12-04FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Saturday 12/4/2021
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 70-RESIDUALS AREA>71-
Residuals Area - Sludge
Holding Tanks & SAFE
Settle Tank
We worked on fabing and installing the 4" SS piping for the
blowers and the 2" PVC on top of the tank.
2 Daniel Ford No 60-PRODUCT WATER AREA We fabricated the 8" and 10" spolls for the water tank and the
calcite lines install and ex joints
3 Daniel Ford No 70-RESIDUALS AREA>73-
Residuals Area - SAFE Filter
System
We are installing the 8" spacers at the safe filter
MANPOWER LOG 4 Workers | 32.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL
Notes:Rick Dayton - Pipe Fitter
Martin Castillo - Laborer
Orlando Cortez - Carpenter
Coy Brite - Carpenter
Created By: Daniel Ford
4 32.0
Manpower Log's Attachments:
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
46°F 56°F 51°F 0.00 in.0.00 in.0.00 in.74%83%89%47°F 5.6 mph 9 mph 13 mph
FBV Morro Bay Joint Venture Page 1 of 2 Printed on 1/24/2023 at 09:32 AM PST
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Partly Cloudy
47°F
Partly Cloudy
50°F
Clear
55°F
Clear
56°F
Clear
53°F
Clear
52°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 08:40:00 PM No
By Date Copies To
FBV Morro Bay Joint Venture Page 2 of 2 Printed on 1/24/2023 at 09:32 AM PST