Loading...
HomeMy WebLinkAbout2021-12-06FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 12/6/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL We were cutting grade for Granite. We also were moving material all over the job to make way for Granite, and we continued with the wattles being installed. We continue with the pipe testing. 2 Daniel Ford No 20-HEADWORKS AREA We are doing some work on the odor control equipment 3 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility The 4" spools were being installed today. We are working and installing the expansion at the water tank 10" drilling out the holes 4 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank The masons continue sacking, patching, and bushinging the top of the SHT walls. We are continuing with the supports for the 2" PVC lines. 5 Daniel Ford No 12-SITE OVERALL - YARD PIPING We exposed the leaking 4" PRW pipe for repair near the lower head works area. 6 Daniel Ford No 60-PRODUCT WATER AREA>61-Product Water Area - Calcite Contactor We are working on the pvc pipe supports. Two 8"x 2" saddles at the Calcite contactors We are bolting up the 20" DMJ at balance tank. We reworked the 6" spool for the flow meter at the IPR.   MANPOWER LOG 36 Workers  |   290.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Granite Construction Inc.5 8.0 40.0     Notes:Created By:  Brody Gill   2 ELECTRICRAFT, INC.7 8.0 56.0     Notes:Created By:  Rick Howland     FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:33 AM PST        No.Contact/Company Workers # Hours Man Hours Location     3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:LABORER FOREMAN Ricardo Belmontez Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Manny Hernandez Charlie Gonzales Jonathan Pratt Estevan, Zamudio Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Teddy Maldonado Benjamin Marquez III Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Brian Egin Rick Jenne Coy Bright Donn Bunte Orlando Cortez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:33 AM PST        No.Contact/Company Workers # Hours Man Hours Location     9 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micah Pixley Pablo Campoverde Raul Velasquez Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.2 8.0 16.0     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez Created By:  Daniel Ford    13 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Danie Ford General forman Created By:  Daniel Ford       36  290.0    Manpower Log's Attachments:  1.  Granite Construction Inc.  GCC Daily Report 12.3.21.pdf   FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:33 AM PST        2.  ELECTRICRAFT, INC.    12-6-2021 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 09:20AM   Durcon V3531-1P1 Epoxy    Comments:Created By: Matt King   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:33 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   2 09:20AM   Ferguson Enterprises, LLC Empty Box Handwheel    Comments:Created By: Matt King 3 09:20AM   Ferguson Enterprises, LLC 1092480 Gaskets    Comments:Created By: Matt King 4 09:20AM   Ferguson Enterprises, LLC 595000-2 Chem Building wall sleeve MR120    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.12.06 DURCON Lab By Design.pdf 2.  2021.12.06 Ferguson EMPTY box handwheel.jpg   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:33 AM PST        3.  2021.12.06 Ferguson Gaskets 471-133.pdf 4.  2021.12.06 Ferguson MR120 Chem Bldg Wall Sleeve.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 57°F 55°F 0.00 in.0.00 in.0.00 in.46%73%93%46°F 4.4 mph 9 mph 10 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   56°F Cloudy   56°F Cloudy   53°F Cloudy   58°F Cloudy   56°F Cloudy   55°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:10:00 AM No     FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:33 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:33 AM PST