HomeMy WebLinkAbout2021-12-07FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 12/7/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL We were cutting grade for Granite. We also were moving material all over the job to make way for Granite, and we continued with the wattles being installed. We are potholing to find leaks in some underground pipes we are testing. 2 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility The 4" spools were being installed today. We are working and installing the expansion at the water tank 10" drilling out the holes 3 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank The masons continue sacking, patching, and bushinging the top of the SHT walls. We are continuing with the supports for the 2" PVC lines. 4 Daniel Ford No 12-SITE OVERALL - YARD PIPING We exposed the leaking 4" PRW pipe for repair near the lower head works area. 5 Daniel Ford No 60-PRODUCT WATER AREA>61-Product Water Area - Calcite Contactor We are working on the pvc pipe supports. Two 8"x 2" saddles at the Calcite contactors We are bolting up the 20" DMJ at balance tank. We reworked the 6" spool for the flow meter at the IPR.   MANPOWER LOG 36 Workers  |   290.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Granite Construction Inc.5 8.0 40.0     Notes:Created By:  Brody Gill   2 RARIG CONSTRUCTION, INC.3 8.0 24.0     Notes:Roof prep Created By:  Michael Rarig      FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 09:33 AM PST        No.Contact/Company Workers # Hours Man Hours Location     3 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland   4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:LABORER FOREMAN Ricardo Belmontez Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Manny Hernandez Charlie Gonzales Estevan, Zamudio Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Teddy Maldonado Benjamin Marquez III Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Brian Egin Rick Jenne Coy Bright Donn Bunte Orlando Cortez     FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 09:33 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  10 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micah Pixley Pablo Campoverde Raul Velasquez Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.2 8.0 16.0     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    13 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez Created By:  Daniel Ford       36  290.0    Manpower Log's Attachments:  1.  Granite Construction Inc.  GCC Daily Report 12.6.21.pdf 3.  ELECTRICRAFT, INC.    12-7-2021 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 09:33 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 United Rental 8.0 No   05:40AM    Notes:loader Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   8 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 09:25AM   DEZURIK INC 624858 6" BFV & 12" BFV    Comments:Created By: Matt King 2 09:25AM   Ferguson Enterprises, LLC 9600407-3 Chem Plumbing    Comments:Created By: Matt King   FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 09:33 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   3 09:25AM   Ferguson Enterprises, LLC 862217 SWR Relief Valve    Comments:Created By: Matt King 4 09:25AM   Ferguson Enterprises, LLC 962217 6in PVC Fittings    Comments:Created By: Matt King 5 09:25AM   Ferguson Enterprises, LLC Handwheel - No packing slip    Comments:Created By: Matt King 6 09:25AM   Miner's Ace Hardware 724539 Area 30 Piping    Comments:Created By: Matt King 7 09:25AM   Miner's Ace Hardware 724538 Safety lunch gifts    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.12.07 Dezurik CSAMSCO BFV MR79_A63.pdf 2.  2021.12.07 Ferguson 9600407-3 Chem Plumbine.pdf   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 09:33 AM PST        3.  2021.12.07 Ferguson 9615138-2 SWR Relief Valve.pdf 4.  2021.12.07 Ferguson FREQ 6in PVC Fittings 9637409.pdf 5.  2021.12.07 Ferguson Handwheel.pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 09:33 AM PST        6.  2021.12.07 Miners 724539 A30 Piping.pdf 7.  2021.12.07 Miners Safety Lunch 724538.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 59°F 55°F 0.02 in.0.02 in.0.02 in.70%84%93%51°F 4.2 mph 5 mph 8 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   54°F Partly Cloudy   55°F Partly Cloudy   59°F Partly Cloudy   59°F Partly Cloudy   56°F Partly Cloudy   55°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:00:00 AM No     FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 09:33 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 09:33 AM PST