Loading...
HomeMy WebLinkAbout2021-12-09FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 12/9/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL strip, patch, and stack material from the frog wall 2 Daniel Ford No 20-HEADWORKS AREA We were installing the FRP cover for the safe filter box 3 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins Allied steel was working on the steel walkways and the handrail. We also fixed a bunch of handrail for the catwalks. 4 Daniel Ford No 50-RO/UV BUILDING We are working on the 4" pipe install including layout 5 Daniel Ford No 12-SITE OVERALL - YARD PIPING We are doing pressure testing on the WWS, PRW, and the pw lines 6 Daniel Ford No 95-OPERATIONS BUILDING We are doing the layout for the TV monitors 7 Daniel Ford No 96-MAINTENANCE BUILDING We are doing the layout for the TV monitors 8 Daniel Ford No 60-PRODUCT WATER AREA>64-Product Water - Outfall Pump Station We are doing the lugs for the fiberglass tanks   MANPOWER LOG 29 Workers  |   209.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.7 8.0 56.0     Notes:Created By:  Rick Howland   2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 09:34 AM PST        No.Contact/Company Workers # Hours Man Hours Location     3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Manny Hernandez Hector Sanchez Estevan Zamudio Charlie Gonzales Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Benjamin Marquez III Jonathan Pratt Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.4 5.0 20.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Brian Egin Rick Jenn Orlando Cortez Coy Bright Donn Bunte Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 09:34 AM PST        No.Contact/Company Workers # Hours Man Hours Location     9 J.R. Filanc Construction Company, Inc.2 4.0 8.0     Notes:APPRENTICE CEMENT MASON Aldofo campverde Samuel Rannals Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 5.0 5.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez Created By:  Daniel Ford       29  209.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    12-9-2021 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 09:34 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   6 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   7 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 09:35AM   Burt Industrial Supply Inc 100756 Circular saw blade    Comments:Created By: Matt King 2 09:35AM   Ferguson Enterprises, LLC 862217 MR132 Sinks    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.12.09 Burts Industrial 100756 471-123.pdf   FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 09:34 AM PST        2.  2021.12.09 Ferguson 9638151 MR132 Sinks.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 55°F 53°F 0.05 in.0.06 in.0.08 in.67%80%97%47°F 7.5 mph 15 mph 17 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   53°F Cloudy   52°F Clear   55°F Cloudy   55°F Partly Cloudy   54°F Clear   52°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:40:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 09:34 AM PST