HomeMy WebLinkAbout2021-12-10FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Friday 12/10/2021
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL cal osha inspector showed up on site.
We were organizing and cleaning the entire job site
Pressure testing of underground water lines continues.
We continued to sack and patch the frog wall.
2 Daniel Ford No 20-HEADWORKS AREA We were installing the FRP cover for the safe filter box
3 Daniel Ford No 30-TREATMENT AREA>31-
Treatment Area - BNR
Basins
We laid out for the air lines in the BNR tank, and worked on
the defuser piping
4 Daniel Ford No 50-RO/UV BUILDING We are working on the 4" pipe install including layout
Equipment was being drilled and anchored down
5 Daniel Ford No 12-SITE OVERALL - YARD
PIPING
We are doing pressure testing on the WWS, PRW, and the pw
lines
6 Daniel Ford No 95-OPERATIONS
BUILDING
We are doing the layout for the TV monitors
7 Daniel Ford No 96-MAINTENANCE
BUILDING
We are doing the layout for the TV monitors
8 Daniel Ford No 60-PRODUCT WATER
AREA>64-Product Water -
Outfall Pump Station
fab and installing the 6" PVC at the balance tank
9 Daniel Ford No 12-SITE OVERALL - YARD
PIPING
We spent 3 hours locating and repairing a pipe leak
10 Daniel Ford No 70-RESIDUALS AREA>72-
Residuals Area -
Dewatering Facility
We cut and installed the 4" flg adapter for the dewatering area
FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:35 AM PST
MANPOWER LOG 34 Workers | 249.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 Granite Construction Inc.6 8.0 48.0
Notes:Created By: Brody Gill
2 ELECTRICRAFT, INC.6 8.0 48.0
Notes:Created By: Rick Howland
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:SUPERINTENDENT
Troy Rosevear
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:CARPENTER FOREMAN
Phil Lacey
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Martin Castillo
Angel Diaz
Manny Hernandez
Hector Sanchez
Estevan Zamudio
Charlie Gonzales
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL
Notes:LABORER APPRENTICE
Teddy Maldonado
Johnathan Torres
Benjamin Marquez III
Jonathan Pratt
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.4 5.0 20.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Brian Egin
Rick Jenn
FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:35 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
Orlando Cortez
Coy Bright
Donn Bunte
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:CARPENTER APPRENTICE
Pablo Campoverde
Raul velasquez
Created By: Daniel Ford
9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Certified Welder Pipefitter
Rick Dayton
Created By: Daniel Ford
10 J.R. Filanc Construction Company, Inc.2 4.0 8.0
Notes:APPRENTICE CEMENT MASON
Aldofo campverde
Samuel Rannals
Created By: Daniel Ford
11 J.R. Filanc Construction Company, Inc.1 5.0 5.0
Notes:OPERATOR APPRENTICE
Joe (Trevor) Hernandez
Created By: Daniel Ford
34 249.0
Manpower Log's Attachments:
1. Granite Construction Inc.
GCC Daily Report 12.8.21.pdf
FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:35 AM PST
2. ELECTRICRAFT, INC.
12-10-2021 Daily Report.xls
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 0.0 No 06:05AM 00-GENERAL
Notes:18000 pound mini excavator
Created By: Daniel Ford
2 AHERN RENTAL 8.0 No 01:10PM 00-GENERAL
Notes:JCB
Created By: Daniel Ford
3 United Rental 8.0 No 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 No 05:40AM
Notes:Scissor lift
Created By: Daniel Ford
5 United Rental 8.0 No 03:05PM 00-GENERAL
Notes:24k generator
Created By: Daniel Ford
6 AHERN RENTAL 8.0 No 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
7 United Rental 8.0 No 02:00PM 00-GENERAL
Notes:Telescoping Forklift
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 09:40AM Burt Industrial Supply Inc.101013 Fire Hoses
Comments:Created By: Matt King
2 09:40AM Ferguson Enterprises, LLC 862217 Faucet
Comments:Created By: Matt King
FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:35 AM PST
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
3 09:40AM ITP 1275302 Hex Bolt
Comments:Created By: Matt King
4 07:15AM Charter Machine Company Spill Containment
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2021.12.10 Burt Industrial 101013 471-138.pdf
2.
2021.12.10 Ferguson Faucet.pdf
FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:35 AM PST
3.
2021.12.10 Ferguson ITP FREQ BN.pdf
4.
2021.12.10 Charter Machine Spill Containment.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
45°F 58°F 50°F 0.00 in.0.05 in.0.06 in.40%63%80%38°F 4.4 mph 8 mph 17 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Cloudy
46°F
Clear
48°F
Clear
57°F
Clear
59°F
Clear
54°F
Clear
51°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 07:00:00 AM No
FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:35 AM PST
By Date Copies To
FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:35 AM PST