HomeMy WebLinkAbout2021-12-13FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Monday 12/13/2021
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL Prepping for rain run off.
bmp and wattles are being installed.
pipe testing continues.
2 Daniel Ford No 50-RO/UV BUILDING We are working on the 4" pipe install including layout
Equipment was being drilled and anchored down. We are also
drilling and putting in pipe supports.
3 Daniel Ford No 12-SITE OVERALL - YARD
PIPING
We are doing pressure testing on the WWS, PRW, and the pw
lines
4 Daniel Ford No 60-PRODUCT WATER
AREA>64-Product Water -
Outfall Pump Station
fab and installing the 6" PVC at the balance tank
5 Daniel Ford No 70-RESIDUALS AREA>72-
Residuals Area -
Dewatering Facility
We grouted the dewatering columns
MANPOWER LOG 34 Workers | 247.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 Granite Construction Inc.5 8.0 40.0
Notes:Created By: Brody Gill
2 Granite Construction Inc.1 2.0 2.0
Notes:Created By: Brody Gill
3 ELECTRICRAFT, INC.7 8.0 56.0
Notes:Created By: Rick Howland
FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 09:36 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:SUPERINTENDENT
Troy Rosevear
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:CARPENTER FOREMAN
Phil Lacey
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Martin Castillo
Angel Diaz
Manny Hernandez
Hector Sanchez
Estevan Zamudio
Charlie Gonzales
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL
Notes:LABORER APPRENTICE
Teddy Maldonado
Johnathan Torres
Benjamin Marquez III
Jonathan Pratt
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.4 5.0 20.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Brian Egin
Rick Jenn
Orlando Cortez
Coy Bright
Donn Bunte
Created By: Daniel Ford
9 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:CARPENTER APPRENTICE
Micha Pixley
Raul velasquez
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 09:36 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Certified Welder Pipefitter
Rick Dayton
Created By: Daniel Ford
11 J.R. Filanc Construction Company, Inc.1 4.0 4.0
Notes:APPRENTICE CEMENT MASON
Samuel Rannals
Created By: Daniel Ford
12 J.R. Filanc Construction Company, Inc.1 5.0 5.0
Notes:OPERATOR APPRENTICE
Joe (Trevor) Hernandez
Created By: Daniel Ford
34 247.0
Manpower Log's Attachments:
1. Granite Construction Inc.
GCC Daily Report 12.10.21.pdf
3. ELECTRICRAFT, INC.
12-13-2021 Daily Report.xls
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 0.0 No 06:05AM 00-GENERAL
Notes:18000 pound mini excavator
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 09:36 AM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
2 AHERN RENTAL 8.0 No 01:10PM 00-GENERAL
Notes:JCB
Created By: Daniel Ford
3 United Rental 8.0 No 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 No 05:40AM
Notes:Scissor lift
Created By: Daniel Ford
5 United Rental 8.0 No 03:05PM 00-GENERAL
Notes:24k generator
Created By: Daniel Ford
6 AHERN RENTAL 8.0 No 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
7 United Rental 8.0 No 02:00PM 00-GENERAL
Notes:Telescoping Forklift
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 09:40AM ITP 1262088 Hex Cap
Comments:Created By: Matt King
2 09:40AM Miner's Ace Hardware 725069 Misc Cons
Comments:Created By: Matt King
Delivery Log's Attachments:
FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 09:36 AM PST
1.
2021.12.13 Ferguson FREQ Phillip.pdf
2.
2021.12.13 Miners 725069 Misc Cons.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
51°F 57°F 53°F 1.46 in.1.46 in.1.46 in.69%83%94%49°F 12.5 mph 21 mph 35 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Cloudy
52°F
Rain
53°F
Rain
52°F
Rain
54°F
Rain
56°F
Rain
57°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 06:50:00 AM No
FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 09:36 AM PST
By Date Copies To
FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 09:36 AM PST