Loading...
HomeMy WebLinkAbout2021-12-14FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 12/14/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL managing rain bmp and wattles are being installed. pipe testing continues. 2 Daniel Ford No 50-RO/UV BUILDING We are working on the 4" pipe install including layout Equipment was being drilled and anchored down. We are also drilling and putting in pipe supports. 3 Daniel Ford No 12-SITE OVERALL - YARD PIPING We are doing pressure testing on the WWS, PRW, and the pw lines   MANPOWER LOG 29 Workers  |   213.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.8 8.0 64.0     Notes:Created By:  Rick Howland   2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Manny Hernandez     FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:36 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Hector Sanchez Estevan Zamudio Charlie Gonzales Created By:  Daniel Ford  5 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Benjamin Marquez III Jonathan Pratt Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.4 5.0 20.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Brian Egin Rick Jenn Orlando Cortez Coy Bright Donn Bunte Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Raul velasquez Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 4.0 4.0     Notes:APPRENTICE CEMENT MASON Samuel Rannals Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 5.0 5.0     Notes:OPERATOR APPRENTICE Joe (Trevor) Hernandez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:36 AM PST        No.Contact/Company Workers # Hours Man Hours Location        29  213.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    12-14-2021 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   7 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:36 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 09:45AM   ENDURO COMPOSITES INC 560934 FRP Replacement    Comments:Created By: Matt King 2 09:45AM   Ferguson Enterprises, LLC 9656597 6in PVC Fittings    Comments:Created By: Matt King 3 09:45AM   Ferguson Enterprises, LLC 9656696 PVC Fittings    Comments:Created By: Matt King 4 09:45AM   Harrington Industrial Plastics LLC 004L3414-1 Ball Valves    Comments:Created By: Matt King 5 09:45AM   HD Supply White Cap 45293559 Straw Wattle    Comments:Created By: Matt King 6 09:45AM   HD Supply White Cap 45293559 Wattle    Comments:Created By: Matt King Delivery Log's Attachments: 1.  2021.12.14 Enduro FRP replacement.pdf   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:36 AM PST        2.  2021.12.14 Ferguson 9656597 6in PVC Fittings.pdf 3.  2021.12.14 Ferguson 9656696 PVC Fittings.pdf 4.  2021.12.14 Harrington 004L3414-1 MR 123.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:36 AM PST        5.  2021.12.14 White Cap 45293559 Wattle.pdf 6.  2021.12.14 White Cap Wattle 45293559.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 43°F 58°F 49°F 0.90 in.2.36 in.2.36 in.62%78%90%43°F 8.9 mph 20 mph 26 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Rain   49°F Rain   48°F Rain   48°F Partly Cloudy   51°F Clear   50°F Clear   45°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 08:15:00 AM No     FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:36 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:36 AM PST