Loading...
HomeMy WebLinkAbout2021-12-17FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 12/17/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL We did some work on the entrance in the front. We also worked on a bunch of clean up and organizing all over the site. We started taking out all the mud out of the areas near the RO building and the Chemical building 2 Daniel Ford No 20-HEADWORKS AREA We were installing the FRP cover for the safe filter box 3 Daniel Ford No 50-RO/UV BUILDING We are working on pipe supports, anchors, and installation, and putting together all PVC in this building. The 2" flanges outside of the building (for the chemical containment piping) are being installed. 4 Daniel Ford No 12-SITE OVERALL - YARD PIPING We are doing pressure testing on the WWS, PRW, and the pw lines   MANPOWER LOG 26 Workers  |   197.5 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 RARIG CONSTRUCTION, INC.3 6.5 19.5     Notes:Unload and leak repair Created By:  Michael Rarig    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:37 AM PST        No.Contact/Company Workers # Hours Man Hours Location     4 J.R. Filanc Construction Company, Inc.1 7.0 7.0 00-GENERAL     Notes:CARPENTER FOREMAN Phil Lacey Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Manny Hernandez Estevan Zamudio Charlie Gonzales Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Benjamin Marquez III Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Brian Egin Rick Jenn Orlando Cortez Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Raul Velasquez Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 3.0 3.0     Notes:APPRENTICE CEMENT MASON Samuel Rannals     FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:37 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  11 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland      26  197.5    Manpower Log's Attachments:  11.  ELECTRICRAFT, INC.    12-17-2021 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   7 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:37 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 07:20AM   AIRGAS 3182    Comments:Created By: Monica Weiss 2 07:20AM   Ferguson Enterprises, LLC 656696-1 PVC    Comments:Created By: Monica Weiss 3 07:20AM   Ferguson Enterprises, LLC 0662974 SCH80 4*2*2 Tee    Comments:Created By: Monica Weiss 4 07:20AM   Ferguson Enterprises, LLC 9665627 3" sch 80 90 ell    Comments:Created By: Monica Weiss 5 07:20AM   Ferguson Enterprises, LLC 9665657 4X2 Flush Bushing (Returned)    Comments:Created By: Monica Weiss 6 07:20AM   Ferguson Enterprises, LLC CM036505    Comments:Created By: Monica Weiss 7 07:20AM   Perry's Automotive Truck repair failed smog    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2021.12.17 Airgas 3182.pdf   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:37 AM PST        2.  2021.12.17 Ferguson 656696-1 PVC.pdf 3.  2021.12.17 Ferguson 0662974.pdf 4.  2021.12.17 Ferguson 9665627.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:37 AM PST        5.  2021.12.17 Ferguson 9665657.pdf 6.  2021.12.17 Ferguson CM036505.pdf 7.  2021.12.17 Perrys Auto.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 45°F 54°F 49°F 0.00 in.0.32 in.0.32 in.64%72%80%40°F 6.6 mph 12 mph 20 mph   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:37 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   46°F Clear   49°F Clear   52°F Clear   54°F Clear   50°F Clear   49°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:30:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:37 AM PST