Loading...
HomeMy WebLinkAbout2021-12-21FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 12/21/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL We did some work on the entrance in the front. We also worked on a bunch of clean up and organizing all over the site. We started taking out all the mud out of the areas near the RO building and the Chemical building. Pipe testing continues. 2 Daniel Ford No 20-HEADWORKS AREA We were installing the FRP cover for the safe filter box 3 Daniel Ford No 50-RO/UV BUILDING We are working on pipe supports, anchors, and installation, and putting together all PVC in this building. The 2" flanges outside of the building (for the chemical containment piping) are being installed. 4 Daniel Ford No 12-SITE OVERALL - YARD PIPING We are doing pressure testing on the WWS, PRW, and the pw lines 5 Daniel Ford No 20-HEADWORKS AREA We were drilling and anchoring and grouting the supports at the head works. Work on the safe filter box cover continues. We are workin g on the yard piping in both the upper and lower head works. We also flipped the the 12" auto valve for the fine screens. 6 Daniel Ford No 60-PRODUCT WATER AREA>64-Product Water - Outfall Pump Station Bolts were being installed in this area 7 Daniel Ford No 95-OPERATIONS BUILDING The TVs are all mounted in this building   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:39 AM PST          MANPOWER LOG 35 Workers  |   275.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Granite Construction Inc.4 8.0 32.0     Notes:Created By:  Brody Gill   2 RARIG CONSTRUCTION, INC.6 8.0 48.0     Notes:Roofing Created By:  Michael Rarig    3 RARIG CONSTRUCTION, INC.4 8.0 32.0 70-RESIDUALS AREA>72-Residuals Area - Dewatering Facility     Notes:Roof prep Created By:  Michael Rarig    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Manny Hernandez Estevan Zamudio Charlie Gonzales Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Benjamin Marquez III Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez     FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:39 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Raul Velasquez Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 3.0 3.0     Notes:APPRENTICE CEMENT MASON Samuel Rannals Created By:  Daniel Ford    11 ELECTRICRAFT, INC.7 8.0 56.0     Notes:Created By:  Rick Howland      35  275.0    Manpower Log's Attachments:  1.  Granite Construction Inc.  GCC Daily Report 12.20.21.pdf 11.  ELECTRICRAFT, INC.    12-21-2021 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:39 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   7 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 08:00AM   Capital Flow 12464 IPR Tank Connection    Comments:Created By: Monica Weiss 2 08:00AM   Environmental Dynamics International (EDI) Area 70 SS Drop Legs    Comments:Created By: Monica Weiss 3 08:00AM   Ferguson Enterprises, LLC 9666043 3in sch 80 90ell / 4*2 bushings    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:39 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   4 08:00AM   Miner's Ace Hardware 725768 SILT FENCING    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2021.12.21 CapFlo 12464 IPR Tank Connection.pdf 2.  2021.12.21 EDI SS Drop Legs A70 .pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:39 AM PST        3.  2021.12.21 Ferguson 9666043 .pdf 4.  2021.12.21 Miners Silt Fence 725768.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 43°F 57°F 50°F 0.00 in.0.00 in.0.00 in.56%69%77%40°F 3.6 mph 7 mph 10 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   45°F Partly Cloudy   49°F Partly Cloudy   57°F Partly Cloudy   57°F Partly Cloudy   52°F Partly Cloudy   48°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 09:00:00 AM No     FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:39 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:39 AM PST