Daily Log: Wednesday 12/22/2021
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL We started assembling the hose bibs
Rick D was prw layout all over the job and creating isos
drawings and generating a prw for the PRW
2 Daniel Ford No 20-HEADWORKS AREA We drilla and installed bolts for the Safe filter box
The mounter the adapter flange for the frp at the foul air
system
Pipe supports were being anchored and grouting was taking
place for the pipe supports.
3 Daniel Ford No 50-RO/UV BUILDING We are working on pipe supports, anchors, and installation,
and putting together all PVC in this building.
We installed 4 8" risers.
Fabricated 1 8" riser
We
4 Daniel Ford No 12-SITE OVERALL - YARD
PIPING
We are doing pressure testing on the WWS, PRW, and the pw
lines
5 Daniel Ford No 20-HEADWORKS AREA We were drilling and anchoring and grouting the supports at
the head works.
Work on the safe filter box cover continues.
We are workin g on the yard piping in both the upper and
lower head works. We also flipped the the 12" auto valve for
the fine screens.
6 Daniel Ford No 60-PRODUCT WATER
AREA>64-Product Water -
Outfall Pump Station
Bolts were being installed in this area
FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 09:40 AM PST
MANPOWER LOG 39 Workers | 250.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 Granite Construction Inc.4 8.0 32.0
Notes:Created By: Brody Gill
2 RARIG CONSTRUCTION, INC.10 5.0 50.0
Notes:Roofing
Created By: Michael Rarig
3 J.R. Filanc Construction Company, Inc.1 10.0 10.0 00-GENERAL
Notes:GENERAL FOREMAN
Daniel Ford
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Martin Castillo
Angel Diaz
Manny Hernandez
Estevan Zamudio
Charlie Gonzales
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.3 4.0 12.0 00-GENERAL
Notes:LABORER APPRENTICE
Teddy Maldonado
Johnathan Torres
Benjamin Marquez III
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Orlando Cortez
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.3 4.0 12.0 00-GENERAL
Notes:CARPENTER APPRENTICE
Pablo Campoverde
Raul Velasquez
Micha Pixley
FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 09:40 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Certified Welder Pipefitter
Rick Dayton
Created By: Daniel Ford
9 J.R. Filanc Construction Company, Inc.1 4.0 4.0
Notes:APPRENTICE CEMENT MASON
Samuel Rannals
Created By: Daniel Ford
10 1 8.0 8.0
Notes:Created By: Daniel Ford
11 1 2.0 2.0
Notes:Forman
Phil Lacey
Created By: Daniel Ford
12 ELECTRICRAFT, INC.8 8.0 64.0
Notes:Created By: Rick Howland
39 250.0
Manpower Log's Attachments:
1. Granite Construction Inc.
GCC Daily Report 12.21.21.pdf
12. ELECTRICRAFT, INC.
12-22-2021 Daily Report.xls
FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 09:40 AM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 0.0 No 06:05AM 00-GENERAL
Notes:18000 pound mini excavator
Created By: Daniel Ford
2 AHERN RENTAL 8.0 No 01:10PM 00-GENERAL
Notes:JCB
Created By: Daniel Ford
3 United Rental 8.0 No 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 No 05:40AM
Notes:Scissor lift
Created By: Daniel Ford
5 United Rental 8.0 No 03:05PM 00-GENERAL
Notes:24k generator
Created By: Daniel Ford
6 AHERN RENTAL 8.0 No 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
7 United Rental 8.0 No 02:00PM 00-GENERAL
Notes:Telescoping Forklift
Created By: Daniel Ford
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
50°F 58°F 55°F 0.83 in.0.83 in.0.84 in.55%74%95%47°F 6.7 mph 12 mph 19 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Cloudy
54°F
Cloudy
57°F
Rain
54°F
Rain
57°F
Rain
55°F
Rain
58°F
FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 09:40 AM PST
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 06:15:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 09:40 AM PST