Loading...
HomeMy WebLinkAbout2021-12-22FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 12/22/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL We started assembling the hose bibs Rick D was prw layout all over the job and creating isos drawings and generating a prw for the PRW 2 Daniel Ford No 20-HEADWORKS AREA We drilla and installed bolts for the Safe filter box The mounter the adapter flange for the frp at the foul air system Pipe supports were being anchored and grouting was taking place for the pipe supports. 3 Daniel Ford No 50-RO/UV BUILDING We are working on pipe supports, anchors, and installation, and putting together all PVC in this building. We installed 4 8" risers. Fabricated 1 8" riser We 4 Daniel Ford No 12-SITE OVERALL - YARD PIPING We are doing pressure testing on the WWS, PRW, and the pw lines 5 Daniel Ford No 20-HEADWORKS AREA We were drilling and anchoring and grouting the supports at the head works. Work on the safe filter box cover continues. We are workin g on the yard piping in both the upper and lower head works. We also flipped the the 12" auto valve for the fine screens. 6 Daniel Ford No 60-PRODUCT WATER AREA>64-Product Water - Outfall Pump Station Bolts were being installed in this area   FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 09:40 AM PST          MANPOWER LOG 39 Workers  |   250.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Granite Construction Inc.4 8.0 32.0     Notes:Created By:  Brody Gill   2 RARIG CONSTRUCTION, INC.10 5.0 50.0     Notes:Roofing Created By:  Michael Rarig    3 J.R. Filanc Construction Company, Inc.1 10.0 10.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Manny Hernandez Estevan Zamudio Charlie Gonzales Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.3 4.0 12.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Benjamin Marquez III Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.3 4.0 12.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Raul Velasquez Micha Pixley     FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 09:40 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 4.0 4.0     Notes:APPRENTICE CEMENT MASON Samuel Rannals Created By:  Daniel Ford    10 1 8.0 8.0     Notes:Created By:  Daniel Ford   11 1 2.0 2.0     Notes:Forman Phil Lacey Created By:  Daniel Ford    12 ELECTRICRAFT, INC.8 8.0 64.0     Notes:Created By:  Rick Howland      39  250.0    Manpower Log's Attachments:  1.  Granite Construction Inc.  GCC Daily Report 12.21.21.pdf 12.  ELECTRICRAFT, INC.    12-22-2021 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 09:40 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   7 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 58°F 55°F 0.83 in.0.83 in.0.84 in.55%74%95%47°F 6.7 mph 12 mph 19 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   54°F Cloudy   57°F Rain   54°F Rain   57°F Rain   55°F Rain   58°F   FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 09:40 AM PST          OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:15:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 09:40 AM PST