Loading...
HomeMy WebLinkAbout2021-12-27FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 12/27/2021    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL The front entrance was all cleaned up and reworked today. Water samples were taken in all 5 discharge locations and pictures were uploaded to procore Pipe testing continues. 2 Daniel Ford No 20-HEADWORKS AREA We were installing the FRP cover for the safe filter box 3 Daniel Ford No 50-RO/UV BUILDING Auto valves were being installed as well the unistrut. We cut and installed the unistrut for the supports and welding to the columns. Column supports are being installed at the Ro/UV 4 Daniel Ford No 12-SITE OVERALL - YARD PIPING We are doing pressure testing on the WWS, PRW, and the pw lines   MANPOWER LOG 22 Workers  |   168.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Manny Hernandez Charlie Gonzales Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 09:42 AM PST        No.Contact/Company Workers # Hours Man Hours Location     3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Brian Elgin Don butte Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Raul Velasquez Enrique Padilla Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 0.0 0.0     Notes:APPRENTICE CEMENT MASON Samuel Rannals Created By:  Daniel Ford    8 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland      22  168.0    Manpower Log's Attachments:  8.  ELECTRICRAFT, INC.    12-27-2021 Daily Report.xls     FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 09:42 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   7 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 43°F 54°F 48°F 0.37 in.0.39 in.0.91 in.71%79%91%42°F 8.3 mph 13 mph 25 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Rain   46°F Rain   53°F Rain   52°F Rain   54°F Partly Cloudy   50°F Partly Cloudy   47°F   FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 09:42 AM PST          OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:20:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 09:42 AM PST