Loading...
HomeMy WebLinkAbout2022-01-03FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 1/3/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL Job site clean up We were pumping water out of the cassette tanks, the BNR and the chemical building today. We were working on the shelfs in the PVC container pipe supports and misc equipment were being grouted today Survey continues around the site 2 Daniel Ford No 50-RO/UV BUILDING We are fabricating the 8" pvc pipes and we tested haf of the 2" chemical lines outside of the containment pipe. 3 Daniel Ford No 12-SITE OVERALL - YARD PIPING We are doing pressure testing on the WWS, PRW, and the pw lines 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System We were installing bolts in the MBR area. We monuted the compressor valve train as well as the strut supports. We were drilling and installing the anchor supports in this area. We also were working on the compressor canopy 5 Daniel Ford No 20-HEADWORKS AREA Removed broken threads for the headworks valve (back charge to Kusters) The 1 inch pvc for the PRW line was being installed 6 Sean Ferguson No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility Received materials and boom lift started vents.   MANPOWER LOG 37 Workers  |   296.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford     FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:44 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  2 J.R. Filanc Construction Company, Inc.7 8.0 56.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Angel Diaz Manny Hernandez Estaban zamudio Charlie Gonzales Benjamin Marquez Hector Schanez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Ben Marquez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Brian Elgin Don butte Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Enrique Padilla Mikah Pixley Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:44 AM PST        No.Contact/Company Workers # Hours Man Hours Location     7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Journey Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    11 5 8.0 40.0     Notes:Roofing and wall sheeting Created By:  Michael Rarig    12 ELECTRICRAFT, INC.7 8.0 56.0     Notes:Created By:  Rick Howland   13 Knecht's Plumbing & Heating, Inc.1 8.0 8.0 70-RESIDUALS AREA>72-Residuals Area - Dewatering Facility     Notes:Created By:  Sean Ferguson      37  296.0    Manpower Log's Attachments:  12.  ELECTRICRAFT, INC.    1-3-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:44 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   7 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 11:40AM   Miner's Ace Hardware RO/UV Parts and Fittings    Comments:Created By: Monica Weiss 2 11:40AM   Ferguson Enterprises, LLC U-Bolts A60    Comments:Created By: Monica Weiss 3 11:40AM   Harrington Industrial Plastics LLC 004L4223-3 & 2    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:44 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   4 11:40AM   Miner's Ace Hardware 726584 RO RO Fittings    Comments:A60 Created By: Monica Weiss 5 11:40AM   PACIFIC COAST BOLT CORP 1093109 Misc Bolts for completing areas    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.01.02 Miners RO.pdf 2.  2022.01.03 Ferguson U-Bolts A60.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:44 AM PST        3.  2022.01.03 Harrington 004L4223-3 & 2.pdf 4.  2022.01.03 Miners 726584 RO .pdf 5.  2022.01.03 Pac Coast Bolt 1093109.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 43°F 54°F 48°F 0.00 in.0.00 in.0.00 in.72%83%91%43°F 4.5 mph 7 mph 12 mph   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:44 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   44°F Partly Cloudy   46°F Partly Cloudy   53°F Partly Cloudy   55°F Partly Cloudy   51°F Partly Cloudy   47°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 09:10:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:44 AM PST