HomeMy WebLinkAbout2022-01-04FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 1/4/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL Exposing and repairing ground wire at various locations around the job. Watering the hydro seed site wide.Some backfiling happened at pond 1. Back filling and grading was happening at near the outfall area. Bolts for the declor T section. We are working on shelves and organizing the connexes. 2 Daniel Ford No 50-RO/UV BUILDING We are fabricating the 8" pvc pipes and we tested haf of the 2" chemical lines outside of the containment pipe. 3 Daniel Ford No 12-SITE OVERALL - YARD PIPING We are doing pressure testing on the WWS, PRW, and the pw lines 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System We were installing bolts in the MBR area. We monuted the compressor valve train as well as the strut supports. We were drilling and installing the anchor supports in this area. We also were working on the compressor canopy 5 Daniel Ford No 20-HEADWORKS AREA We fabricated and were installing the the PRW line for the section of piping we worked on the 3" to 1" to 1/2 piping. Supports for the PRW linje are being installed. Anchoring continues for the foul air system Anchors are being set for the fine screens. 6 Daniel Ford No 12-SITE OVERALL - YARD PIPING We exposed detected and repaired a leak in the FBN system just east of the SHT. 7 Daniel Ford No 60-PRODUCT WATER AREA Bolts and the 20" spacer are being installed. We set up forms and grouted under the 3 IPR pumps and 2 of the outfall pumps.   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:44 AM PST          NOTES LOG    No.Created By Issue?Location Comments   8 Sean Ferguson No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility Started running vents and laying out water.   MANPOWER LOG 38 Workers  |   304.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Granite Construction Inc.4 8.0 32.0     Notes:Created By:  Brody Gill   2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Martin Castillo Manny Hernandez Estaban zamudio Charlie Gonzales Hector Schantz Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Ben Marquez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Brian Elgin Don butte Rick Jenne     FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:44 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  6 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Enrique Padilla Mikah Pixley Raul velasquez Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Journey Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    12 ELECTRICRAFT, INC.8 8.0 64.0     Notes:Created By:  Rick Howland     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:44 AM PST        No.Contact/Company Workers # Hours Man Hours Location     13 Knecht's Plumbing & Heating, Inc.2 8.0 16.0 70-RESIDUALS AREA>72-Residuals Area - Dewatering Facility     Notes:Created By:  Sean Ferguson      38  304.0    Manpower Log's Attachments:  1.  Granite Construction Inc.  GCC Daily Report 1.3.22.pdf 12.  ELECTRICRAFT, INC.    1-4-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:44 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   7 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 11:55AM   Harrington Industrial Plastics LLC 8030224 A50 & A90 PVC CPVC    Comments:Created By: Monica Weiss 2 11:55AM   Harrington Industrial Plastics LLC 004L4223-1 A50 & A90 PVC CPVC    Comments:Created By: Monica Weiss 3 11:55AM   Miner's Ace Hardware 726679 HDW & PRW    Comments:A20 Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:44 AM PST        1.  2022.01.04 Harrington A50_A90.pdf 2.  2022.01.04 Harrington.pdf 3.  2022.01.04 Miners 726679 HDW PRW.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 45°F 58°F 51°F 0.00 in.0.00 in.0.00 in.68%85%93%47°F 4.6 mph 9 mph 15 mph   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:44 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   45°F Partly Cloudy   50°F Clear   56°F Clear   57°F Partly Cloudy   54°F Clear   51°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:55:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:44 AM PST