Loading...
HomeMy WebLinkAbout2022-01-05FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 1/5/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL Rock and wattles were being installed and we are dealing with improvements to our Swppp program. The watering of the hydroseeding is ongoing. We have re worked the front entrance this morning. We are working on shelves and organizing the connexes. Bolts were being installed at the declor piping. 2 Daniel Ford No 12-SITE OVERALL - YARD PIPING We are doing pressure testing on the WWS, PRW, and the pw lines 3 Daniel Ford No 20-HEADWORKS AREA We were fabricating and installing supports at the headworks as well as the PRW 4 Daniel Ford No 12-SITE OVERALL - YARD PIPING pipe testing continues. 5 Daniel Ford No 60-PRODUCT WATER AREA We were grouting pumps, and drilling and epoxing in the outfall pumps. 6 Daniel Ford No 95-OPERATIONS BUILDING We were moving excess dirt and spoils aso working on the sub grade from this area so granite could continue their work. 7 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins We were installing the blower lines and the defussersers 8 Sean Ferguson No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility Continue vents and water.   MANPOWER LOG 43 Workers  |   329.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 RARIG CONSTRUCTION, INC.5 5.0 25.0     Notes:Wall sheeting and trim     FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 09:44 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Michael Rarig  2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:GENERAL FOREMAN Daniel Ford Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Hector Schantz Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Ben Marquez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Brian Elgin Don Butte Rick Jenne Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:CARPENTER APPRENTICE Raul Vasquez Mikah Pixley Raul velasquez Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 09:44 AM PST        No.Contact/Company Workers # Hours Man Hours Location     8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Journey Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    12 Granite Construction Inc.4 8.0 32.0     Notes:Created By:  Brody Gill   13 ELECTRICRAFT, INC.8 8.0 64.0     Notes:Created By:  Rick Howland   14 Knecht's Plumbing & Heating, Inc.2 8.0 16.0 70-RESIDUALS AREA>72-Residuals Area - Dewatering Facility     Notes:Created By:  Sean Ferguson      43  329.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 09:44 AM PST        12.  Granite Construction Inc.  GCC Daily Report 1.4.22.pdf 13.  ELECTRICRAFT, INC.    1-5-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   01:10PM  00-GENERAL  Notes:JCB Created By: Daniel Ford   3 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   5 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   7 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 09:44 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 12:05PM   Ferguson Enterprises, LLC MR133 Expansion Joints    Comments:Created By: Monica Weiss 2 12:05PM   NEGRANTI & SONS 33285 1.5 Rock    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.01.05 Ferguson MR133 Exp Joints.pdf 2.  2022.01.05 Negranti 33285 1.5 Rock .pdf     FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 09:44 AM PST        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 62°F 55°F 0.00 in.0.00 in.0.00 in.57%71%82%46°F 8.6 mph 12 mph 20 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   51°F Partly Cloudy   53°F Clear   59°F Clear   63°F Clear   58°F Clear   57°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:40:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 09:44 AM PST