HomeMy WebLinkAbout2022-01-07FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 1/7/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Sean Ferguson No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility Continue vents and water. 2 Troy Rosevear No 00-GENERAL - Continued watering the hydro seed. - Continued cleaning and repairing BMP's throughout the Site. - Continued Surveying Curbs and Gutters for Granite. - Started Excavating to install catch basin and Storm Drain pipe from the west side of the operations to Storm Pond # 2. Lots of rock!!!!!!! - Performed SWPPP site inspection. 3 Troy Rosevear No 20-HEADWORKS AREA - Continued installing PRW to the Odor control and screening equipment on the south slab of the Headworks. - Installed 4" SS DI spool to complete the SS lift station discharge piping to the Headworks. 4 Troy Rosevear No 60-PRODUCT WATER AREA - Leveled and bolted back up the pumps at the outfall and IPR pump stations. - Installed pipe supports on the fiberglass tanks 5 Troy Rosevear No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - Continued installing the blower lines, defuser piping and anchors at the BNR Tank. Missing some items from the vendor which we have ordered. - Reworked FRP Baffles at the BNR Tank, missing some hardware which we have ordered. 6 Troy Rosevear No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - Continue vents and water. - Opened up FBW line so we can repair a leak on the east side of the SHT. 7 Troy Rosevear No 30-TREATMENT AREA - Installed PRW supports at the MBR tank.   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:45 AM PST          MANPOWER LOG 38 Workers  |   302.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Knecht's Plumbing & Heating, Inc.3 8.0 24.0 70-RESIDUALS AREA>72-Residuals Area - Dewatering Facility     Notes:Created By:  Sean Ferguson   2 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Hector Schantz Created By:  Troy Rosevear    3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Created By:  Troy Rosevear    4 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Brian Elgin Don Butte Rick Jenne Created By:  Troy Rosevear    5 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Mikah Pixley Created By:  Troy Rosevear    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Troy Rosevear      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:45 AM PST        No.Contact/Company Workers # Hours Man Hours Location     7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Troy Rosevear    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Troy Rosevear    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Troy Rosevear    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Journey Cement Mason Daniel Sheslingoff Created By:  Troy Rosevear    11 RARIG CONSTRUCTION, INC.2 8.0 16.0     Notes:Trim Created By:  Michael Rarig    12 RARIG CONSTRUCTION, INC.2 7.0 14.0     Notes:Seaming roof Created By:  Michael Rarig    13 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland   14 Granite Construction Inc.4 8.0 32.0     Notes:Created By:  Brody Gill      38  302.0    Manpower Log's Attachments:  13.  ELECTRICRAFT, INC.    1-7-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:45 AM PST        14.  Granite Construction Inc.  GCC Daily Report 1.6.22.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Troy Rosevear   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Troy Rosevear   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Troy Rosevear   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Troy Rosevear   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Troy Rosevear   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Troy Rosevear     FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:45 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 12:15PM   Airgas 9915    Comments:Created By: Monica Weiss 2 12:15PM   Ferguson Enterprises, LLC 471-152 A50 RO    Comments:Created By: Monica Weiss 3 12:15PM   Ferguson Enterprises, LLC 9656696-2 PVC Tee    Comments:Created By: Monica Weiss 4 12:15PM   HD Supply White Cap 45445139 Safety    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.01.07 Airgas 9915.pdf 2.  2022.01.07 Ferguson 471-152.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:45 AM PST        3.  2022.01.07 Ferguson 9656696-2 PVC tee.pdf 4.  2022.01.07 White Cap 45445139 Safety.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 49°F 56°F 52°F 0.00 in.0.00 in.0.00 in.75%90%98%50°F 3.2 mph 7 mph 10 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   51°F Partly Cloudy   51°F Partly Cloudy   55°F Cloudy   56°F Cloudy   55°F Cloudy   54°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:55:00 AM No     FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:45 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:45 AM PST