Loading...
HomeMy WebLinkAbout2022-01-08FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Saturday 1/8/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility Continue vents and water. 2 Daniel Ford No 20-HEADWORKS AREA - Fabricate and install 2" PRW in the fine screen area and at the recirc pump 3 Daniel Ford No 60-PRODUCT WATER AREA - Install the 10" IPR plus the supports - Spacer bolts for the 10" calcite were installed today 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - Installation of anchors and grouting was performed today - strut was being installed in the washdown area. 5 Daniel Ford No 30-TREATMENT AREA - Installed PRW supports at the MBR tank. 6 Daniel Ford No 50-RO/UV BUILDING - anchoring and work on the supports is ongoing in this building   MANPOWER LOG 9 Workers  |   72.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Hector Schantz Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 3 Printed on 1/24/2023 at 09:46 AM PST        No.Contact/Company Workers # Hours Man Hours Location     3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Rick Jenne Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice carpenter Enrique Padila Created By:  Daniel Ford       9  72.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   2 AHERN RENTAL 4.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 2 of 3 Printed on 1/24/2023 at 09:46 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   3 United Rental 4.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 United Rental 4.0 No   06:15AM    Notes:mini excavator Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 49°F 59°F 53°F 0.00 in.0.00 in.0.00 in.59%74%95%45°F 7.7 mph 13 mph 26 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   50°F Clear   51°F Clear   58°F Clear   59°F Clear   55°F Clear   54°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:15:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 3 of 3 Printed on 1/24/2023 at 09:46 AM PST