HomeMy WebLinkAbout2022-01-10FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 1/10/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Continued cleaning and repairing BMP's throughout the Site. -The excavation for the DI and drain pipe west of the Opps building continues. We are digging through lots of rocks and pipes running across our excavation - We were cleaning mud out of the swales all over the job -The 6" FBW line was exposed and we found 2 dead squirrels had crawled into the line before we sealed it (sadly they didn't make it) we removed said squires from the pipe and continued with the repair. - We set up for the 3" PRW water line test 2 Daniel Ford No 20-HEADWORKS AREA - We installed the PRW hose bib -The bushing for the headworks PRW line was installed. 3 Daniel Ford No 60-PRODUCT WATER AREA - Leveled and bolted back up the pumps at the outfall and IPR pump stations. - Installed pipe supports on the fiberglass tanks 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - Continued installing the blower lines, defuser piping and anchors at the BNR Tank. Missing some items from the vendor which we have ordered. - Reworked FRP Baffles at the BNR Tank, missing some hardware which we have ordered. 5 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - Continue vents and water. - Opened up FBW line so we can repair a leak on the east side of the SHT. 6 Daniel Ford No 30-TREATMENT AREA - Installed PRW supports at the MBR tank. 7 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - the anchoring and grouting for the MBR piping continues.   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:46 AM PST          MANPOWER LOG 39 Workers  |   310.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Granite Construction Inc.2 8.0 16.0     Notes:Created By:  Brody Gill   2 Granite Construction Inc.2 5.0 10.0     Notes:Created By:  Brody Gill   3 RARIG CONSTRUCTION, INC.4 8.0 32.0     Notes:Trim Created By:  Michael Rarig    4 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Raul Velasquez Mikah Pixley Enrique Padilla Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:46 AM PST        No.Contact/Company Workers # Hours Man Hours Location     8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Journey Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    13 Parada Painting Inc.2 10.0 20.0 12-NORTH - PIPING     Notes:Primer coat pipes Created By:  Monica Weiss    14 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland      39  310.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:46 AM PST        2.  Granite Construction Inc.  GCC Daily Report 1.7.22.pdf 13.  Parada Painting Inc.  01.10 DFR PARADA.pdf 14.  ELECTRICRAFT, INC.    1-10-2021 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:46 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 01:05PM   Ferguson Enterprises, LLC 471-154 9699605    Comments:PRW A20 Created By: Monica Weiss 2 01:05PM   JB DEWAR, INC 190071    Comments:Fuel Created By: Monica Weiss 3 01:05PM   NEGRANTI & SONS 33286 Sand    Comments:Created By: Monica Weiss 4 01:05PM   HD Supply White Cap 45534593 Safety    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:46 AM PST        1.  2022.01.10 Ferguson 471-154 9699605.pdf 2.  2022.01.10 JB Dewar 190071.pdf 3.  2022.01.10 Negranti 33286 Sand.pdf   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:46 AM PST        4.  2022.01.10 White Cap 45534593 Safety.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 47°F 69°F 57°F 0.00 in.0.00 in.0.00 in.26%49%80%37°F 7.6 mph 12 mph 17 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   54°F Cloudy   57°F Partly Cloudy   64°F Partly Cloudy   69°F Clear   64°F Clear   57°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:10:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:46 AM PST