Loading...
HomeMy WebLinkAbout2022-01-11FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 1/11/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Continued cleaning and repairing BMP's throughout the Site. -The excavation for the DI and drain pipe west of the Opps building continues. We are digging through lots of rocks and pipes running across our excavation - We were cleaning mud out of the swales all over the job - The 3" PRW water line test passed at 125 lbs of pressure - Spoils from Granite are being removed -The FBW line was being worked on near the the dewatering pad. - The 4" PRW pipe just east of the lower head works pad was encased in concrete. - 2 small equipment pads were placed and finished near the product water tank today. 2 Daniel Ford No 20-HEADWORKS AREA - We installed the PRW hose bib -The bushing for the headworks PRW line was installed. 3 Daniel Ford No 60-PRODUCT WATER AREA - Painting of the outfall pipes continues - We are working on some anchors and pipe supports 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - Continued installing the blower lines, defuser piping and anchors at the BNR Tank. Missing some items from the vendor which we have ordered. - Reworked FRP Baffles at the BNR Tank, missing some hardware which we have ordered. 5 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - the anchoring and grouting for the MBR piping continues.   FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 09:49 AM PST          MANPOWER LOG 36 Workers  |   292.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Granite Construction Inc.2 8.0 16.0     Notes:Created By:  Brody Gill   2 RARIG CONSTRUCTION, INC.4 8.0 32.0     Notes:Trim Created By:  Michael Rarig    3 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Johnathan Torres Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Raul Velasquez Mikah Pixley Enrique Padilla Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 09:49 AM PST        No.Contact/Company Workers # Hours Man Hours Location     7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    11 Parada Painting Inc.2 10.0 20.0 12-NORTH - PIPING     Notes:Primer Pipe Created By:  Monica Weiss    12 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland      36  292.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 09:49 AM PST        1.  Granite Construction Inc.  GCC Daily Report 1.10.22.pdf 11.  Parada Painting Inc.  01.11 DFR PARADA.pdf 12.  ELECTRICRAFT, INC.    1-11-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 09:49 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 01:15PM   CalPortland Pipe Encasement    Comments:Created By: Monica Weiss 2 01:15PM   Harrington Industrial Plastics LLC RO A50 CPVC    Comments:Created By: Monica Weiss 3 01:15PM   Harrington Industrial Plastics LLC 004L4223-6 RO/ CPVC    Comments:Created By: Monica Weiss 4 01:15PM   Miner's Ace Hardware 727251 Parts    Comments:Created By: Monica Weiss 5 01:15PM   Morro Gas FUEL    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 09:49 AM PST        1.  2022.01.11 Calportland Pipe Encase.pdf 2.  2022.01.11 Harrington RO A50 CPVC.pdf 3.  2022.01.11 Harrington 004l4223-6.pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 09:49 AM PST        4.  2022.01.11 Miners 727251 Parts.pdf 5.  2022.01.11 Morro Gas Fuel.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 71°F 60°F 0.00 in.0.00 in.0.00 in.24%37%51%33°F 9.6 mph 14 mph 20 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   53°F Clear   57°F Clear   64°F Clear   72°F Clear   64°F Clear   60°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:40:00 AM No     FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 09:49 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 09:49 AM PST