Loading...
HomeMy WebLinkAbout2022-01-14FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 1/14/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - The 2" PVC at the vacor washdown area for clean outs and the hose bibs was being installed. - We continued with the pipe testing and filled the PRW line - We excavated and backfill the 4" PRW line - The Level spreader was backfilled - The Safe box trench was filled - Cleaning out dirt from manholes across the job - Small pads were dug near the SHT and up near the Headworks 2 Daniel Ford No 20-HEADWORKS AREA -We stripped the equipment pad and cleaned everything up. -Some work continues for the anchoring and pipe supports 3 Daniel Ford No 60-PRODUCT WATER AREA - Painting of the outfall pipes continues - We are working on some anchors and pipe supports 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We are working on the 3" PRW line for the BNR tank - The work on al the diffusers continues 5 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The Air compressors and and the air tank were set and anchored. 6 Daniel Ford No 50-RO/UV BUILDING - We set the large 12" PVC pipes in the interior - The work on the pipe supports continues - The 12" manifold was set as wel   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:50 AM PST          MANPOWER LOG 43 Workers  |   347.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Granite Construction Inc.9 8.0 72.0     Notes:Created By:  Brody Gill   2 RARIG CONSTRUCTION, INC.2 7.0 14.0     Notes:Gutter and downspouts Created By:  Michael Rarig    3 RARIG CONSTRUCTION, INC.1 8.0 8.0     Notes:Gutter and downspouts Created By:  Michael Rarig    4 RARIG CONSTRUCTION, INC.1 8.0 8.0     Notes:Clean up Created By:  Michael Rarig    5 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:50 AM PST        No.Contact/Company Workers # Hours Man Hours Location     8 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Raul Velasquez Micha Pixley Enrique Padilla Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 11.0 11.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    13 J.R. Filanc Construction Company, Inc.1 11.0 11.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    14 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    15 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Genera Forman Daniel Ford Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:50 AM PST        No.Contact/Company Workers # Hours Man Hours Location     16 ELECTRICRAFT, INC.7 8.0 56.0     Notes:Created By:  Rick Howland      43  347.0    Manpower Log's Attachments:  1.  Granite Construction Inc.  GCC Daily Report 1.13.22.pdf 16.  ELECTRICRAFT, INC.    1-14-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:50 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 01:40PM   Ferguson Enterprises, LLC 471-152 Pipe Clamps    Comments:Created By: Monica Weiss 2 01:40PM   Ferguson Enterprises, LLC 471-154 9696220    Comments:Created By: Monica Weiss 3 01:40PM   Ferguson Enterprises, LLC INSTRUMENTATION B Stainless Steel Instrumentation Piping    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.01.14 Ferguson 471-152 Pipe Clamp.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:50 AM PST        2.  2022.01.14 Ferguson 9696220 471-154.pdf 3.  2022.01.14 Ferguson SS Inst B.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 69°F 58°F 0.00 in.0.00 in.0.00 in.37%53%76%42°F 3.8 mph 7 mph 13 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   56°F Cloudy   58°F Cloudy   63°F Cloudy   66°F Cloudy   58°F Cloudy   57°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:40:00 AM No     FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:50 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:50 AM PST