Loading...
HomeMy WebLinkAbout2022-01-17FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 1/17/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Backfiling Various areas around the job - cleaning Mud from the V ditch all over the site 2 Daniel Ford No 20-HEADWORKS AREA -We stripped the equipment pad and cleaned everything up. -Some work continues for the anchoring and pipe supports - The rebar that set the height for the Headworks skids was removed today. - The PS at the fine screens and the 1" SS pipe fittings were installed and welded. 3 Daniel Ford No 60-PRODUCT WATER AREA - The 90's at the calcite Drain are being installed - We are installing the bolts and for the check valves at the drain pumps 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - The ss blower piping continues to be installed - We continue to work on the defuser piping 5 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The Air compressors and and the air tank were set and anchored. 6 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - We are working on the pipe supports at the Safe filter piping - The Safe filter FRP cover has been completed - The Stair tower continues to be worked on 7 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - The anchors at the dewatering continued to be installed. - The PRW in this area was being fabricated and installed _ The 2" PVC for pumps is being worked on   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:51 AM PST          MANPOWER LOG 34 Workers  |   258.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Raul Velasquez Pablo Campoverde Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 11.0 11.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals     FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:51 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Genera Forman Daniel Ford Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    12 RARIG CONSTRUCTION, INC.1 4.0 4.0 14-PARKING CANOPY     Notes:Check bolts Created By:  Michael Rarig    13 RARIG CONSTRUCTION, INC.3 4.0 12.0 14-PARKING CANOPY     Notes:Move out/clean up Created By:  Michael Rarig    14 ELECTRICRAFT, INC.8 8.0 64.0     Notes:Created By:  Rick Howland      34  258.0      FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:51 AM PST        Manpower Log's Attachments:  14.  ELECTRICRAFT, INC.    1-17-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 02:00PM   HD Supply White Cap 45553226 Grade Rod    Comments:Created By: Monica Weiss 2 02:00PM   PRW STEEL Pipe Support Material Steel plate and pipe    Comments:Created By: Monica Weiss 3 02:00PM   Ferguson Enterprises, LLC INSTRUMENTATION A Brass & PVC Instrumentation Piping    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:51 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   4 02:00PM   Environmental Dynamics International (EDI) Parts Wedge Anchors    Comments:Created By: Monica Weiss 5 02:00PM   BAY AUTO SMOG Repair & Smog P68 Field Truck    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.01.17 White Cap 45553226 Grade Rod.pdf 2.  2022.01.17 PRW Steel .pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:51 AM PST        3.  2022.01.17 Ferguson Brass Inst A.pdf 4.  2022.01.17 EDI Wedge anchor Diffuser.pdf 5.  2022.01.17 Bay Auto smog.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 60°F 55°F 0.04 in.0.05 in.0.05 in.65%78%91%48°F 2.3 mph 4 mph 7 mph   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:51 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   52°F Partly Cloudy   55°F Partly Cloudy   59°F Cloudy   58°F Cloudy   57°F Cloudy   55°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:45:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:51 AM PST