HomeMy WebLinkAbout2022-01-18FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 1/18/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - The 2" PVC at the vacor washdown area for clean outs and the hose bibs was being installed. - We continued with the pipe testing and filled the PRW line - We excavated and backfill the 4" PRW line - We "As built" everything that is going to be under the asphalt - We removed the excess concrete near the entrance at the frog wall. - The Tape covering all the exterior drains has been removed. 2 Daniel Ford No 20-HEADWORKS AREA -We stripped the equipment pad and cleaned everything up. -Some work continues for the anchoring and pipe supports - The rebar that set the height for the Headworks skids was removed today. - The PS at the fine screens and the 1" SS pipe fittings were installed and welded. 3 Daniel Ford No 60-PRODUCT WATER AREA - Painting of the outfall pipes continues - We are working on some anchors and pipe supports 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We installed the PHS at the scum pumps 5 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The Air compressors and and the air tank were set and anchored. 6 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - We removed the blind fange from the RAZ line, wire wheeled the surface, and painted the surface with Bitmastic paint. 7 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - The anchors at the dewatering continued to be installed. - The PRW in this area was being fabricated and installed _ The 2" PVC for pumps is being worked on   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 09:52 AM PST          MANPOWER LOG 32 Workers  |   258.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Teddy Maldanado Ben Marquez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 11.0 11.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 09:52 AM PST        No.Contact/Company Workers # Hours Man Hours Location     7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Genera Forman Daniel Ford Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    12 ELECTRICRAFT, INC.8 8.0 64.0     Notes:Created By:  Rick Howland      32  258.0    Manpower Log's Attachments:  12.  ELECTRICRAFT, INC.    1-18-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 09:52 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 07:10AM   Fastenal 471-155 A30 Bolts    Comments:Created By: Monica Weiss 2 07:10AM   Custom Conveyor Dewatering Conveyor A72    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 09:52 AM PST        1.  2022.01.18 Fastenal 471-155_A30.pdf 2.  2022.01.18 Custom Conveyor Dewatering.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 49°F 57°F 53°F 0.00 in.0.04 in.0.05 in.83%88%94%50°F 4.0 mph 9 mph 14 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   52°F Partly Cloudy   54°F Clear   57°F Clear   56°F Clear   54°F Clear   51°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:45:00 AM No     FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 09:52 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 09:52 AM PST