HomeMy WebLinkAbout2022-01-20FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 1/20/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Backfill of the PW line at the product water tank area is complete - We dug up the 4" PRW line at the chem building to find a leak and install a valve - The Man Hoes for the Sanitary sewers have all been cleaned out - We dug down, got some finish grade marks. and figured out what the risers need to be for a the fire hydrants on site - We discovered a leak in the PW line near the opps building. We have dug up the area and are going to do the repair tomorrow 2 Daniel Ford No 20-HEADWORKS AREA -The bolt up is on going for the upper headworks equipment. A list was created of al missing bolts and components. -The Fine screens are being anchored as well as the pipe supports for the WWS line - We are sacking and patching everything in the Headworks area 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Allied Steel continues with their handrail install. 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We used the crane and few in 2 scissor lifts. One in the west tank and one in the eat tank -We installed the 8" SS flanges - We were fabricating all the 5 inch reducers for the SS blower piping   FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 09:52 AM PST          MANPOWER LOG 27 Workers  |   217.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Teddy Maldanado Ben Marquez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Pablo Campoverde Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 09:52 AM PST        No.Contact/Company Workers # Hours Man Hours Location     7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Genera Forman Daniel Ford Created By:  Daniel Ford    11 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland      27  217.0    Manpower Log's Attachments:  11.  ELECTRICRAFT, INC.    1-20-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 09:52 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 63°F 56°F 0.00 in.0.00 in.0.00 in.56%68%86%46°F 6.0 mph 13 mph 19 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   55°F Clear   55°F Clear   63°F Clear   59°F Clear   57°F Clear   52°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:55:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 09:52 AM PST