HomeMy WebLinkAbout2022-01-21FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Friday 1/21/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed.
- Job site clean up
- maintenance on frog fence an regular fence around the job
- Backfill near the product water tank
- Work continues for the Leve spreader at the north end of the
job
- The 4" PW line was exposed and repaired near the opps
building.
2 Daniel Ford No 20-HEADWORKS AREA -The bolt up is on going for the upper headworks equipment.
A list was created of al missing bolts and components.
-The Fine screens are being anchored as well as the pipe
supports for the WWS line
- We are sacking and patching everything in the Headworks
area
- Forms are set up for pads under the WWS 14" 90's and under
3 foul air components
3 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- Allied Steel continues with their handrail install.
4 Daniel Ford No 30-TREATMENT AREA>31-
Treatment Area - BNR
Basins
- We used the crane and few in 2 scissor lifts. One in the west
tank and one in the eat tank
-We installed the 8" SS flanges
- We were fabricating all the 5 inch reducers for the SS blower
piping
FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:53 AM PST
MANPOWER LOG 26 Workers | 209.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Manny Hernandez
Estaban zamudio
Charlie Gonzales
Angel Diaz
Martin Castillo
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:LABORER APPRENTICE
Jonathan Torres
Teddy Maldanado
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Coy Brite
Brian Elgin
Rick Jenne
Orlando Cortez
Jason Hawthorne
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:CARPENTER APPRENTICE
Enrique Padilla
Pablo Campoverde
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Certified Welder Pipefitter
Rick Dayton
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL
Notes:APPRENTICE CEMENT MASON
Adolfo Campoverde
Samuel Rannals
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:53 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:SUPERINTENDENT
Troy Rosevear
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Created By: Daniel Ford
9 J.R. Filanc Construction Company, Inc.1 7.0 7.0
Notes:Labor Forman
Ricardo Belmontez
Created By: Daniel Ford
10 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Genera Forman
Daniel Ford
Created By: Daniel Ford
11 ELECTRICRAFT, INC.5 8.0 40.0
Notes:Created By: Rick Howland
26 209.0
Manpower Log's Attachments:
11. ELECTRICRAFT, INC.
1-21-2022 Daily Report.xls
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 0.0 No 06:05AM 00-GENERAL
Notes:18000 pound mini excavator
Created By: Daniel Ford
2 United Rental 8.0 No 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:53 AM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
3 AHERN RENTAL 8.0 No 05:40AM
Notes:Scissor lift
Created By: Daniel Ford
4 United Rental 8.0 No 03:05PM 00-GENERAL
Notes:24k generator
Created By: Daniel Ford
5 AHERN RENTAL 8.0 No 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
6 United Rental 8.0 No 02:00PM 00-GENERAL
Notes:Telescoping Forklift
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 07:55AM Airgas 2781 Argon
Comments:Created By: Monica Weiss
2 07:55AM Capital Flow 12617 Saddle for safe filter
Comments:Created By: Monica Weiss
3 07:55AM NEGRANTI & SONS 33297
Comments:Created By: Monica Weiss
4 07:55AM SM TIRE 154171
Comments:Created By: Monica Weiss
5 07:55AM HD Supply White Cap Grade Rod
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:53 AM PST
1.
2022.01.21 Airgas 2781 Argon.pdf
2.
2022.01.21 Capflo 12617 Saddle for safe filter inst.pdf
3.
2022.01.21 Negranti 33297.pdf
FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:53 AM PST
4.
2022.01.21 SM Tire Tube Service 154171.pdf
5.
2022.01.21 White Cap grade rod.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
51°F 65°F 56°F 0.00 in.0.00 in.0.00 in.48%64%84%44°F 8.3 mph 13 mph 22 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
55°F
Clear
56°F
Clear
63°F
Clear
62°F
Clear
57°F
Clear
55°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 11:40:00 AM No
FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:53 AM PST
By Date Copies To
FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:53 AM PST