Loading...
HomeMy WebLinkAbout2022-01-22FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Saturday 1/22/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL 2 Daniel Ford No 20-HEADWORKS AREA -The bolt up is on going for the upper headworks equipment. A list was created of al missing bolts and components. -The Fine screens are being anchored as well as the pipe supports for the WWS line - We are sacking and patching everything in the Headworks area - Forms are set up for pads under the WWS 14" 90's and under 3 foul air components 3 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We were fabricating all the 5 inch reducers for the SS blower piping 4 Daniel Ford No 60-PRODUCT WATER AREA>61-Product Water Area - Calcite Contactor -the Air vacs area being installed. -We fabricated and are installi ng the drains in this area 5 Daniel Ford No 60-PRODUCT WATER AREA>63-Product Water - IPR Product Water Pump Station - The 6" FLG adapter for the IPR line is being installed   MANPOWER LOG 16 Workers  |   130.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Angel Diaz Martin Castillo Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 3 Printed on 1/24/2023 at 09:53 AM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Teddy Maldanado Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Jason Hawthorne Rick Jenne Orlando Cortez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Pablo Campoverde Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 3 Printed on 1/24/2023 at 09:53 AM PST        No.Contact/Company Workers # Hours Man Hours Location     9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Genera Forman Daniel Ford Created By:  Daniel Ford       16  130.0    Manpower Log's Attachments:    WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 49°F 65°F 56°F 0.00 in.0.00 in.0.00 in.33%48%67%36°F 6.0 mph 10 mph 16 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   54°F Partly Cloudy   56°F Partly Cloudy   64°F Clear   61°F Clear   57°F Clear   51°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:25:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 3 of 3 Printed on 1/24/2023 at 09:53 AM PST