Loading...
HomeMy WebLinkAbout2022-01-24FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 1/24/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Job site clean up - maintenance on frog fence an regular fence around the job - Backfill near the product water tank - Work continues for the Leve spreader at the north end of the job - The 4" PW line was exposed and repaired near the opps building. 2 Daniel Ford No 20-HEADWORKS AREA -The bolt up is on going for the upper headworks equipment. A list was created of al missing bolts and components. -The Fine screens are being anchored as well as the pipe supports for the WWS line - We are sacking and patching everything in the Headworks area - Forms are set up for pads under the WWS 14" 90's and under 3 foul air components 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Allied Steel continues with their handrail install. 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We used the crane and few in 2 scissor lifts. One in the west tank and one in the eat tank -We installed the 8" SS flanges - We were fabricating all the 5 inch reducers for the SS blower piping   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 09:53 AM PST          MANPOWER LOG 31 Workers  |   249.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Teddy Maldanado Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Jason Hawthorne Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Pablo Campoverde Micha Pixley Raul Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 09:53 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Genera Forman Daniel Ford Created By:  Daniel Ford    11 ELECTRICRAFT, INC.8 8.0 64.0     Notes:Created By:  Rick Howland      31  249.0    Manpower Log's Attachments:  11.  ELECTRICRAFT, INC.    1-24-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 09:53 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 07:55AM   Harrington Industrial Plastics LLC 4L4750-7 Injection Quills MR135    Comments:Created By: Monica Weiss 2 07:55AM   Harrington Industrial Plastics LLC Inj Q    Comments:Created By: Monica Weiss 3 07:55AM   HD Supply White Cap Laser Tape    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 09:53 AM PST        1.  2022.01.24 Harrington Inj Q 4L4750-7 MR135.pdf 2.  2022.01.24 Harrington Inj Q.pdf 3.  2022.01.24 White Cap laser Tape.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 62°F 55°F 0.00 in.0.00 in.0.00 in.35%58%84%40°F 8.0 mph 15 mph 19 mph   FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 09:53 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   52°F Clear   55°F Clear   60°F Clear   58°F Clear   55°F Clear   50°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 08:35:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 09:53 AM PST