Loading...
HomeMy WebLinkAbout2022-01-25FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 1/25/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Job site clean up - Isco training class - cleaned mud out v diches - worked on northern level spreaders - 2 Daniel Ford No 20-HEADWORKS AREA - working on punch list for the entire upper headworkes 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Allied Steel continues with their handrail install. 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - working on defusr piping east & west - reworking and fabercting blower dufuser piping drop downs 5 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - Worked on walk way an stariecase - Anchored down pipe suppers an staircase strucure - Cleaned up area 6 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - fab & install 2" PRW at dewatering 7 Daniel Ford No 50-RO/UV BUILDING fab & install 6" PVC- Ro uv   MANPOWER LOG 38 Workers  |   315.5 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Granite Construction Inc.7 9.5 66.5     Notes:Created By:  Brody Gill     FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 09:54 AM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Hector Sanchez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rias Lopez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Jason Hawthorne Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Pablo Campoverde Micha Pixley Raul Velasquez Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 09:54 AM PST        No.Contact/Company Workers # Hours Man Hours Location     8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:SUPERINTENDENT Troy Rosevear Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Genera Forman Daniel Ford Created By:  Daniel Ford    12 ELECTRICRAFT, INC.8 8.0 64.0     Notes:Created By:  Rick Howland      38  315.5    Manpower Log's Attachments:  1.  Granite Construction Inc.  GCC Daily Report 1.24.22.pdf 12.  ELECTRICRAFT, INC.    1-25-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 09:54 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 08:00AM   Harrington Industrial Plastics LLC 4L4750-03 MR 135 Inj Quills    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 09:54 AM PST        1.  2022.01.25 Harrington MR135 Inj Q 4l4750-3.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 47°F 64°F 53°F 0.00 in.0.00 in.0.00 in.42%67%90%42°F 6.0 mph 11 mph 18 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   50°F Clear   51°F Clear   63°F Clear   58°F Clear   54°F Clear   49°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:25:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 09:54 AM PST