Loading...
HomeMy WebLinkAbout2022-01-26FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 1/26/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Job site clean up - cleaned mud out v diches - worked on northern level spreaders - clean up concrete from frog wall -Pipe fill test PW 2 Daniel Ford No 20-HEADWORKS AREA - working on punch list for the entire upper headworkes - fab & install 4" pvc headwork drains 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Allied Steel continues with their handrail install. 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - working on diffuser piping east & west - weld 6" S.S for BNR AIR 5 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - Worked on walk way an stariecase - Anchored down pipe suppers an staircase strucure - Cleaned up area - weld suporets 6 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - fab & install 2" PRW at dewatering 7 Daniel Ford No 50-RO/UV BUILDING - fab & install 6" PVC- Ro uv -install 3" pvc   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:55 AM PST          MANPOWER LOG 30 Workers  |   241.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rias Lopez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Jason Hawthorne Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Pablo Campoverde Micha Pixley Raul Velasquez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:55 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    9 RARIG CONSTRUCTION, INC.3 8.0 24.0     Notes:Created By:  Michael Rarig   10 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland      30  241.0    Manpower Log's Attachments:  10.  ELECTRICRAFT, INC.    1-26-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift   FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:55 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 08:00AM   Harrington Industrial Plastics LLC 4L4750-01 Inj Quills    Comments:Created By: Monica Weiss 2 08:00AM   Harrington Industrial Plastics LLC 4L4750-06 Inj Quills    Comments:Created By: Monica Weiss 3 08:00AM   Harrington Industrial Plastics LLC 4L4750-04 Inj Quills    Comments:Created By: Monica Weiss 4 08:00AM   Harrington Industrial Plastics LLC Inj Q    Comments:Created By: Monica Weiss 5 08:00AM   Burt Industrial Supply 10272 471-163 Tools    Comments:Created By: Monica Weiss 6 08:00AM   HD Supply White Cap 45754835 Grout    Comments:Created By: Monica Weiss 7 08:00AM   HD Supply White Cap 45755531 Drill Bits    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:55 AM PST        Delivery Log's Attachments: 1.  2022.01.26 Harrington 4l4750-1 MR135 Inj Q.pdf 2.  2022.01.26 Harrington 4l4750-6 Mr 135.pdf 3.  2022.01.26 Harrington MR135 Inj Q (4750-4).pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:55 AM PST        4.  2022.01.26 Harrington MR135 Inj Q.pdf 5.  2022.01.26 Burt Ind S 102742 471-163 Tools Bits.pdf 6.  2022.01.26 White Cap 45754835 Grout.pdf   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:55 AM PST        7.  2022.01.26 White Cap 45755531.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 43°F 57°F 50°F 0.00 in.0.00 in.0.00 in.63%76%92%43°F 3.2 mph 5 mph 7 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   47°F Clear   49°F Clear   57°F Clear   58°F Clear   54°F Clear   50°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 03:50:00 PM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:55 AM PST