Loading...
HomeMy WebLinkAbout2022-01-27FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 1/27/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Job site clean up - cleaned mud out v diches - excavation for curb and gutter all over the job - 2 Daniel Ford No 20-HEADWORKS AREA - Fab and install Drains and supports - 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Allied Steel continues with their handrail install. - Change the pan cakes for testing on the 12" overflow and the 18" lines - Install the PSH gages for the filtration pump #2 - Install the level transmitter for the RO feed tanks (both 1 and 2) - We started the fabrication for the 3" drains (RO Feed Tank) - Start Fabricating the drain supports and test the RO 12" PVC line. 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - Working on diffuser piping east & west - Work continues on the FRP baffles - The sidewalk and landings for the northern staircase on this building is being laid out 5 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - Worked on walk way an stariecase - Anchored down pipe suppers an staircase strucure - Cleaned up area - weld suporets 6 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - fab & install 2" PRW at dewatering 7 Daniel Ford No 50-RO/UV BUILDING - Some work on pipe supports continue   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:55 AM PST          MANPOWER LOG 27 Workers  |   217.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rias Lopez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Jason Hawthorne Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Pablo Campoverde Micha Pixley Raul Velasquez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:55 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    9 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland      27  217.0    Manpower Log's Attachments:  9.  ELECTRICRAFT, INC.    1-27-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:55 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 08:10AM   Capital Flow 471-167 SS Tube    Comments:Created By: Monica Weiss 2 08:10AM   Capital Flow 471-167 Galvinized bushings    Comments:Created By: Monica Weiss 3 08:10AM   Harrington Industrial Plastics LLC 4L4750-02 Inj Quills Valve    Comments:Created By: Monica Weiss 4 08:10AM   Harrington Industrial Plastics LLC 471-159 Strut    Comments:Created By: Monica Weiss 5 08:10AM   THE HOME DEPOT Sheds    Comments:Created By: Monica Weiss 6 08:10AM   Miner's Ace Hardware 728559 BNR Taps    Comments:Created By: Monica Weiss 7 08:10AM   Ryan Herco Apollo Valves    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:55 AM PST        1.  2022.01.27 Capflo 471-167 SS Tube.pdf 2.  2022.01.27 Capflo 471-167 .pdf 3.  2022.01.27 Harrington 4l4750-2 MR135 Inj Q Valve.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:55 AM PST        4.  2022.01.27 Harrington 471-159 Strut.pdf 5.  2022.01.27 Home Depot 3 Sheds.pdf 6.  2022.01.27 Miners 728559 BNR Taps.pdf   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:55 AM PST        7.  2022.01.27 Ryan Herco Apollo Valves.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 48°F 61°F 55°F 0.00 in.0.00 in.0.00 in.40%56%77%39°F 4.7 mph 7 mph 13 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   53°F Clear   55°F Clear   61°F Clear   58°F Clear   56°F Clear   57°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:05:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:55 AM PST