Loading...
HomeMy WebLinkAbout2022-01-28FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 1/28/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Job site clean up - cleaned mud out v diches - excavation for curb and gutter all over the job (sub grade and moving the spoils) - We picked up trash from al over the job site. - Dust control 2 Daniel Ford No 20-HEADWORKS AREA - Fab and install Drains and supports - Sacking and patching continues - We are installing the 4" PVC 90's for the drain - The two pads were laid out and formed for the stair landings on the east and west side of the headworks. - we laid out a potential spot for the sample box pad 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Allied Steel continues with their handrail install. - We started the fabrication for the 3" drains (RO Feed Tank) - Start Fabricating the drain supports and test the RO 12" PVC line. 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - Working on diffuser piping east & west - Work continues on the FRP baffles - The sidewalk and landings for the northern staircase on this building is formed. - Spray nozzle layout and strut installation is in progress. - The 2" PRW line for the BNR tank is being installed. - Drilled and installed the 6" saddle clamp in pump 5 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - Worked on walk way and staircase - Anchored down pipe suppers an staircase structure - Cleaned up area - weld supports   FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 09:56 AM PST          NOTES LOG    No.Created By Issue?Location Comments   6 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - fab & install 2" PRW at dewatering 7 Daniel Ford No 50-RO/UV BUILDING - Some work on pipe supports continue   MANPOWER LOG 26 Workers  |   209.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland   2 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rias Lopez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Jason Hawthorne Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla     FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 09:56 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Pablo Campoverde Raul Velasquez Created By:  Daniel Ford  6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford       26  209.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    1-28-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 09:56 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 61°F 53°F 0.00 in.0.00 in.0.00 in.29%56%81%39°F 2.7 mph 5 mph 8 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   52°F Clear   52°F Clear   58°F Clear   59°F Clear   52°F Cloudy   51°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:15:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 09:56 AM PST