Loading...
HomeMy WebLinkAbout2022-01-29FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Saturday 1/29/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Instruments were installed - We water tested the filtration line in the slab - supports were anchored 2 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - Working on diffuser piping east & west - Work continues on the FRP baffles - The sidewalk and landings for the northern staircase on this building is formed. - Spray nozzle layout and strut installation is in progress. - The 2" PRW line for the BNR tank is being installed. - Drilled and installed the 6" saddle clamp in pump 3 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - Cleaned up area - We grouted in the safe filter 4 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - fab & install 2" PRW at dewatering 5 Daniel Ford No 50-RO/UV BUILDING - Some work on pipe supports continue   MANPOWER LOG 14 Workers  |   112.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Angel Diaz Martin Castillo Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 3 Printed on 1/24/2023 at 09:56 AM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Pablo Campoverde Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford       14  112.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 2 of 3 Printed on 1/24/2023 at 09:56 AM PST          WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 54°F 66°F 58°F 0.00 in.0.00 in.0.00 in.23%34%43%30°F 7.1 mph 12 mph 18 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   55°F Cloudy   55°F Partly Cloudy   62°F Partly Cloudy   67°F Clear   60°F Clear   59°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 03:30:00 PM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 3 of 3 Printed on 1/24/2023 at 09:56 AM PST