Loading...
HomeMy WebLinkAbout2022-01-31FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 1/31/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Job site clean up - cleaned mud out v diches - excavation for curb and gutter all over the job (sub grade and moving the spoils) - We picked up trash from al over the job site. - Dust control - Superior Gunite we working on the concrete swales at the soi slip area and in the ravine 2 Daniel Ford No 20-HEADWORKS AREA - We installed the ph sensor for the foul air - The two pads were laid out and formed for the stair landings on the east and west side of the headworks. - we laid out a potential spot for the sample box pad and summited it to the design team 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Allied Steel continues with their handrail install. - We started the fabrication for the 3" drains (RO Feed Tank) - Start Fabricating the drain supports and test the RO 12" PVC line. - The Cassette filtration and ejector were installed for the northern line today 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - Working on diffuser piping east & west - Work continues on the FRP baffles - Spray nozzle layout and strut installation is in progress. - The 2" PRW line for the BNR tank is being installed. _ We connected all the SS blower piping to the diffusers on the west side of the tank 5 Daniel Ford No 50-RO/UV BUILDING - Some work on pipe supports continue 6 Daniel Ford No 60-PRODUCT WATER AREA - We went back and tightened al the bots for area 60 7 Monica Weiss No 00-GENERAL Storm Water Training   FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 09:56 AM PST        Notes Log's Attachments: 7.  2022.01.31 SWT.pdf   MANPOWER LOG 22 Workers  |   171.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Norman Gularte Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Jason Hawthorne Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 09:56 AM PST        No.Contact/Company Workers # Hours Man Hours Location     4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Micha Pixley Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    9 Superior Gunite 3 6.0 18.0     Notes:Install Meshwire Created By:  Monica Weiss       22  171.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 09:56 AM PST        9.  Superior Gunite  01.31 DFR Superior.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 09:56 AM PST          WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 47°F 62°F 55°F 0.00 in.0.00 in.0.00 in.38%51%80%38°F 7.3 mph 10 mph 15 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   50°F Partly Cloudy   53°F Cloudy   63°F Cloudy   62°F Cloudy   59°F Partly Cloudy   57°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:15:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 09:56 AM PST