HomeMy WebLinkAbout2022-02-03FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 2/3/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Backfilling and hauling dirt to the ravine - A couple hours on the level spreaders - excavation for curb and gutter all over the job (sub grade and moving the spoils) - Spoils were dozed up and spoils from superior were dealt with 2 Daniel Ford No 20-HEADWORKS AREA - We grouted some equipment at the headworks 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - We are drilling and installing the brackets for the metal tanks - Work on the instrumentation continues - Start Fabricating the drain supports and test the RO 12" PVC line. - The Cassette filtration and ejector were installed for the northern line today - The install for the AIR comp piping on the cassette is ongoing - Install drain valves for the scum and WAS pumps 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - The 2" PRW line for the BNR tank is being installed. - We connected all the SS blower piping to the diffusers on the East side of the tank - We are welding the 5" SS flanges for the BNR air lines - The diffuser piping continues - We modified   MANPOWER LOG 35 Workers  |   285.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez     FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 09:58 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Norman Gularte Created By:  Daniel Ford  2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Moldanado Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Jason Hawthorne Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Micha Pixley Raul Velasquez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 09:58 AM PST        No.Contact/Company Workers # Hours Man Hours Location     7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    9 ELECTRICRAFT, INC.8 8.0 64.0     Notes:Created By:  Rick Howland   10 Parada Painting Inc.2 10.0 20.0 60-PRODUCT WATER AREA>64- Product Water - Outfall Pump Station     Notes:Created By:  Monica Weiss   11 Allied Steel Co., Inc.3 8.0 24.0     Notes:MBR Tank Created By:  Monica Weiss       35  285.0    Manpower Log's Attachments:  9.  ELECTRICRAFT, INC.    2-3-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 09:58 AM PST        10.  Parada Painting Inc.  02.03 DFR PARADA.pdf 11.  Allied Steel Co., Inc.  2022.02.03 Allied DFR.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 09:58 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 10:35AM   Capital Flow SS Fittings    Comments:Created By: Monica Weiss 2 10:35AM   Capital Flow SS Tubing    Comments:Created By: Monica Weiss 3 10:35AM   Ferguson Enterprises, LLC 36in SS    Comments:Created By: Monica Weiss 4 10:35AM   Ferguson Enterprises, LLC Romac Saddle    Comments:Created By: Monica Weiss 5 10:35AM   Miner's Ace Hardware PVC 729090    Comments:Created By: Monica Weiss 6 10:35AM   Sitech Trimble Stand    Comments:Created By: Monica Weiss 7 10:35AM   Ferguson Enterprises, LLC Zephyr Fume Hood    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 09:58 AM PST        1.  2022.02.03 Capflo SS Fittings.pdf 2.  2022.02.03 Capflo SS Tube.pdf 3.  2022.02.03 Ferguson 36in SS.pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 09:58 AM PST        4.  2022.02.03 Ferguson Romac Saddle.pdf 5.  2022.02.03 Miners PVC 729090.pdf 6.  2022.02.03 Sitech Trimble Stand.pdf   FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 09:58 AM PST        7.  2022.02.03 Zephyr Fume Hood.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 47°F 61°F 52°F 0.00 in.0.00 in.0.00 in.25%53%83%34°F 5.2 mph 9 mph 15 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   47°F Clear   51°F Clear   62°F Partly Cloudy   57°F Clear   54°F Clear   49°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:15:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 09:58 AM PST