Loading...
HomeMy WebLinkAbout2022-02-07FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 2/7/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - We are removing the hay from the v ditch - Spreading hay at the frog wall - excavation for curb and gutter all over the job (sub grade and moving the spoils) - Work continues at the Level spreaders - Pipe testing for the PRW continues - Curb and gutters excavation continues - 12" PVC was installed at the declor pad 2 Daniel Ford No 20-HEADWORKS AREA -We placed concrete for the 2 stairs off the headworks and for the sample box as well as 2 equipment pads. 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - We are drilling and installing the brackets for the metal tanks - Work on the instrumentation continues - We install 12" saddles for the RO feed tanks on the 12" PVC line - The 3/4" air was installed - We installed the 14" supports - The 2" CPVC containment on the cassette tank continues - We placed concrete for a small landing at the Stairs at the north end of the MBR/BNR area. 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - The Diffusers continue to be worked on - We connected all the SS blower piping to the diffusers on the East side of the tank - The FRP baffles are being bolted up 5 Daniel Ford No 60-PRODUCT WATER AREA Placed concrete in a 4'x4' slap for the 20" overflow off the outfall balance tank.   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 09:59 AM PST          MANPOWER LOG 31 Workers  |   249.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 RARIG CONSTRUCTION, INC.4 8.0 32.0 90-CHEMICAL FACILITY     Notes:Roofing Created By:  Michael Rarig    2 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Norman Gularte Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Moldanado Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Jason Hawthorne Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Micha Pixley Raul Velasquez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 09:59 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    10 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland      31  249.0    Manpower Log's Attachments:  10.  ELECTRICRAFT, INC.    2-7-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 09:59 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 11:00AM   Harrington Industrial Plastics LLC 471-183    Comments:Created By: Monica Weiss 2 11:00AM   HD Supply White Cap Grade Tape    Comments:Created By: Monica Weiss 3 11:00AM   TRI STAR INDUSTRIAL LLC Pipe Supports    Comments:Created By: Monica Weiss 4 11:00AM   Harrington Industrial Plastics LLC SS Bushings    Comments:Created By: Monica Weiss 5 11:00AM   Harrington Industrial Plastics LLC A50 4L5053-2    Comments:Created By: Monica Weiss 6 11:00AM   Ferguson Enterprises, LLC Angle Valves    Comments:Created By: Monica Weiss 7 11:00AM   CalPortland    Comments:Stair Landing   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 09:59 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.02.07 Harrington Clamps 471-183.pdf 2.  2022.02.07 White Cap Grade Tape.pdf 3.  2022.02.07 Tristar Pipe Supports MBR A32.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 09:59 AM PST        4.  2022.02.07 Harrington 471-183 Bushing SS.pdf 5.  2022.02.07 Harrington 4L5053-2 A50.pdf 6.  2022.02.07 Ferguson Angle Valve.pdf   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 09:59 AM PST        7.  2022.02.07 Calportland Pipe Support Stair Landing.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 44°F 58°F 51°F 0.00 in.0.00 in.0.00 in.51%71%88%42°F 2.6 mph 5 mph 9 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   45°F Clear   51°F Clear   56°F Clear   59°F Clear   57°F Clear   50°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 11:35:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 09:59 AM PST