Loading...
HomeMy WebLinkAbout2022-02-09FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 2/9/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - We are removing the hay from the v ditch - We took the yard truck to Santa Maria Tire to get new tires - We are digging, detecting, and repairing leaks for the PW line near buildings 17 and 15 - Work continues on the level spreaders 2 Daniel Ford No 20-HEADWORKS AREA - We are installing the pipe supports for the 6" line on the outside of safe filter box. - We removing the forms for the pipe support pads at the foul air - The pipe supports for the WWS line is in progress. - 1 1/2 angel valves for the hose bibs 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The 3/4 inch SS lines are being installed - We are working on the relief and rupture discs for the was and scum - The 2" blind at to RO feed tank - Instlal the bolts at the PRW pumps 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - The Diffusers continue to be worked on - We connected all the SS blower piping to the diffusers on the East side of the tank - The FRP baffles are being bolted up 5 Daniel Ford No 60-PRODUCT WATER AREA Placed concrete in a 4'x4' slap for the 20" overflow off the outfall balance tank.   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 10:00 AM PST          MANPOWER LOG 35 Workers  |   278.5 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 RARIG CONSTRUCTION, INC.5 7.5 37.5 70-RESIDUALS AREA>72-Residuals Area - Dewatering Facility     Notes:Roofing and trim Created By:  Michael Rarig    2 J.R. Filanc Construction Company, Inc.7 8.0 56.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Norman Gularte Daniel Waddle Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Maldanado Javier Trevino Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Jason Hawthorne Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla     FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 10:00 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Micha Pixley Raul Velasquez Created By:  Daniel Ford  6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    10 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland      35  278.5    Manpower Log's Attachments:  10.  ELECTRICRAFT, INC.    2-9-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 10:00 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 11:25AM   Ferguson Enterprises, LLC 471-176 As Builts    Comments:Created By: Monica Weiss 2 11:25AM   Harrington Industrial Plastics LLC 471-182 PVC    Comments:Created By: Monica Weiss 3 11:25AM   Harrington Industrial Plastics LLC MR137 A60    Comments:Created By: Monica Weiss 4 11:25AM   JB DEWAR, INC 19462    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 10:00 AM PST        1.  2022.02.09 Ferguson 471-176 A30 AsBlt.pdf 2.  2022.02.09 Harrington 471-182 PVC Pipe.pdf 3.  2022.02.09 Harrington MR137 A60.pdf   FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 10:00 AM PST        4.  2022.02.09 JB Dewar 194162.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 59°F 80°F 68°F 0.00 in.0.00 in.0.00 in.21%29%35%35°F 8.2 mph 12 mph 20 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   62°F Clear   66°F Clear   77°F Clear   80°F Clear   74°F Clear   67°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:05:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 10:00 AM PST